My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
100725 REGULAR
>
CITY COUNCIL REGULAR AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2025 3:27:07 PM
Creation date
10/10/2025 3:21:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2025
DESTRUCT DATE
15Y
DOCUMENT NO
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10/7/25
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 Exhibit B <br />Page 51 of 64 <br />c. Where there is evidence suitable to the local enforcing agency substantiating that <br />additional local utility infrastructure design requirements, directly related to the <br />implementation of Section 5.106.5.3, may adversely impact the construction cost of the <br />project. <br /> <br />20.26.350 Section 5.106.5.5.1 amended Electric vehicle charging readiness requirements for <br />warehouses, grocery stores and retail stores with planned off-street loading spaces. <br /> <br />Section 5.106.5.5.1 is amended to read as follows: <br /> <br />5.106.5.5.1 Warehouses, grocery stores and retail stores with planned off-street loading spaces. <br />In order to avoid future demolition when adding EV supply and distribution equipment, spare <br />raceway(s) or busway(s) and adequate capacity for transformer(s), service panel(s) or subpanel(s) <br />shall be installed at the time of construction in accordance with the California Electrical Code. <br />Construction plans and specifications shall include, but are not limited to, the following: <br />1. The transformer, main service equipment and subpanels shall meet the minimum power <br />requirement in Table 5.106.5.4.1.1 to accommodate the dedicated branch circuits for the future <br />installation of EVSE. <br />2. The construction documents shall indicate one or more location(s) convenient to the planned <br />off-street loading space(s) reserved for medium- and heavy-duty ZEV charging cabinets and <br />charging dispensers, and a pathway reserved for routing of conduit from the termination of the <br />raceway(s) or busway(s) to the charging cabinet(s) and dispenser(s), as shown in Table <br />5.106.5.4.1.1. <br />3. Raceway(s) or busway(s) originating at a main service panel or a subpanel(s) serving the area <br />where potential future medium- and heavy-duty EVSE will be located, and shall terminate in <br />close proximity to the potential future location of the charging equipment for medium- and <br />heavy-duty vehicles. <br />4. The raceway(s) or busway(s) shall be of sufficient size to carry the minimum additional system <br />load to the future location of the charging for medium- and heavy-duty EVs as shown in Table <br />5.106.5.4.1.1. <br /> <br /> <br />Page 62 of 376
The URL can be used to link to this page
Your browser does not support the video tag.