Laserfiche WebLink
City of Pleasanton | Stormwater System Management Plan | PWD 25.601 | PAGE 11  <br />Wood Rodgers will convert the collected data into a geodatabase and will document the results on a map showing where necessary  <br />data is missing. The map will serve as a basis for determining which missing data is essential and for prioritizing field inspections.  <br />Deliverable(s): Data Collection Memo | Data Gap Map | Updated Geodatabase  <br />Task 2.4 – Geodatabase Refinement <br />Wood Rodgers proposes to refine/design a geodatabase to store and manage  <br />storm drain facility information; prioritize data collection and inventory;  <br />facilitate condition assessment; and facilitate hydrologic and hydraulic  <br />model development (see Exhibit 3). Leveraging our geodatabase design  <br />and management experience, Wood Rodgers’ GIS programmers will work  <br />closely with the City to create or refine the existing grid or numerically‐based  <br />numbering/naming procedure to systematically assign a unique identifier to  <br />each feature.  <br />Wood Rodgers will deploy a cost‐effective system and inventory approach  <br />developed and refined during previous drainage master plan studies. See  <br />exhibit 3 – Geodatabase.  <br />Wood Rodgers will review the City’s existing geodatabase and recommend any  <br />necessary refinements to capture all storm drain facility properties and  <br />conditions to be inspected. The refinements will be based on a comprehensive  <br />geodatabase with related tables and domain values that have already been  <br />designed and are being used for other public agencies. For those municipalities,  <br />Wood Rodgers modified the Environmental Systems Research Institute (Esri) file geodatabase using the Esri Local Government  <br />Information System Model as the basis, and then supplemented it with drainage feature datasets such as field surveys, topography,  <br />drainage facilities (including storm drains, maintenance holes, pumps, open channels, structures, etc.), georeferenced as‐  <br />built drawings, parcel maps, streets, municipal boundaries, photographs from field visits and inspections with photo locations,  <br />watersheds, land use data, soil data, and hydrologic and hydraulic parameter data.  <br />Wood Rodgers will store all the surveyed and inspected drainage facility data, condition assessments, model development data, and  <br />results in the geodatabase and make it a centralized repository for this Storm Drain Master Plan Project.  <br />Deliverable(s): Refined geodatabase  <br />Task 2.5 – Desktop Asset Inventory <br />Depending on the completeness of the City’s existing geodatabase,  <br />Wood Rodgers will perform a desktop GIS inventory task for the City’s  <br />drainage facilities using georeferenced record drawings for  <br />approximately 10 miles of pipes (see Exhibit 4) to further supplement  <br />the data gaps identified in Task 2.3 and to verify the existing attributes in  <br />the City’s geodatabase. This task is important for complicated or curved  <br />storm drain systems.  <br />Wood Rodgers will complete storm drain properties in the geodatabase  <br />with the record drawings that were created prior to field inspections.  <br />This has been proven to be the most cost‐effective approach in other  <br />drainage studies and assessment projects, when combined with limited field <br />inspection data, to provide a more complete inventory of storm  <br />drainsystems. This approach will also provide sufficient resolution and accuracy for capacity and condition assessments.  <br />Wood Rodgers will georeference record drawings and use existing survey data to complete the geodatabase inventory of the City’s  <br />systems. We will use NearMap (or any orthoimagery) with three‐inch or better resolution and Google Street View to locate facilities  <br />and to create or refine existing spatial locations. This approach provides horizontal accuracy between 1 to 2 feet, which is sufficient  <br />to determine locations for a maintenance hole, a catch basin and an outfall structure, and to estimate the connecting storm drain  <br />lengths. The latest LiDAR data will be used to determine the facility rim or ground elevations when survey data is not available.  <br />Newer LiDAR data typically has sufficient point resolution and vertical accuracy (typically less than three inches) to determine  <br />Exhibit 3  <br />Exhibit 4  <br />EXHIBIT A <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8