Laserfiche WebLink
City of Pleasanton | Stormwater System Management Plan | PWD 25.601 | PAGE 18  <br />Task 4.3 – Maintenance, Rehabilitation, and Replacement Plan <br />Wood Rodgers will develop a maintenance, rehabilitation, and replacement plan that summarizes the survey and inspection;  <br />describes the storm drain and pump station assessment results; and recommends activities and work to restore drainage facility  <br />condition and maximize their useful life for up to 46 projects. Based on Wood Rodgers’ inspection and condition assessment  <br />experience, there is generally a 20% to 30% chance that the inspected facilities are in critical condition and require maintenance,  <br />rehabilitation, and replacement recommendations. That probability translates to 46 projects out of the 180 sites proposed to be  <br />inspected in Task 4.2.  <br />Wood Rodgers will recommend maintenance activities, rehabilitation work, and replacement projects to address deficiencies in  <br />critical condition based on field assessments, the remaining useful life of facilities, and cost effectiveness. When a facility is near the  <br />end of its useful life or the rehabilitation cost is greater than the replacement cost, replacement work is recommended over  <br />rehabilitation work. When the improvements recommended to address deficiencies require substantial resources and planning for  <br />implementation, the improvements are categorized in the Capital Improvement Plan described in Task 5.  <br />The need and extent of rehabilitation and replacement work will be estimated from the inspection reports and site photos for the  <br />inspected facilities with “critical” and “poor” structural condition ratings. The inspected facilities with a “poor” rating are  <br />recommended for continued monitoring in case they become “critical.” Inspected facilities with a “critical” rating are recommended  <br />for improvement, either through a capital improvement or more minor rehabilitation/replacement.  <br />Deliverable(s): Maintenance, Rehabilitation, and Replacement Plan for 46 projects  <br />EXHIBIT A <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8