My WebLink
|
Help
|
About
|
Sign Out
WOOD RODGERS, INC. (#2026291)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WOOD RODGERS, INC. (#2026291)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2025 10:05:24 AM
Creation date
11/6/2025 10:02:37 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
WOOD RODGERS, INC.
Contract Record Series
704-05
Munis Contract #
2026291
Contract Expiration
10/13/2029
NOTES
STORMWATER SYSTEM MANAGEMENT PLAN, CIP NO. 25659
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton | Stormwater System Management Plan | PWD 25.601 | PAGE 18 <br />Task 4.3 – Maintenance, Rehabilitation, and Replacement Plan <br />Wood Rodgers will develop a maintenance, rehabilitation, and replacement plan that summarizes the survey and inspection; <br />describes the storm drain and pump station assessment results; and recommends activities and work to restore drainage facility <br />condition and maximize their useful life for up to 46 projects. Based on Wood Rodgers’ inspection and condition assessment <br />experience, there is generally a 20% to 30% chance that the inspected facilities are in critical condition and require maintenance, <br />rehabilitation, and replacement recommendations. That probability translates to 46 projects out of the 180 sites proposed to be <br />inspected in Task 4.2. <br />Wood Rodgers will recommend maintenance activities, rehabilitation work, and replacement projects to address deficiencies in <br />critical condition based on field assessments, the remaining useful life of facilities, and cost effectiveness. When a facility is near the <br />end of its useful life or the rehabilitation cost is greater than the replacement cost, replacement work is recommended over <br />rehabilitation work. When the improvements recommended to address deficiencies require substantial resources and planning for <br />implementation, the improvements are categorized in the Capital Improvement Plan described in Task 5. <br />The need and extent of rehabilitation and replacement work will be estimated from the inspection reports and site photos for the <br />inspected facilities with “critical” and “poor” structural condition ratings. The inspected facilities with a “poor” rating are <br />recommended for continued monitoring in case they become “critical.” Inspected facilities with a “critical” rating are recommended <br />for improvement, either through a capital improvement or more minor rehabilitation/replacement. <br />Deliverable(s): Maintenance, Rehabilitation, and Replacement Plan for 46 projects <br />EXHIBIT A <br />Docusign Envelope ID: DF86282A-2A84-404C-9F8A-A035AEFBCFF8
The URL can be used to link to this page
Your browser does not support the video tag.