My WebLink
|
Help
|
About
|
Sign Out
_DEIR
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
_DEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 3:54:34 PM
Creation date
12/2/2025 3:49:57 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Aesthetics, Light, and Glare Draft EIR <br /> <br /> <br />3.1-16 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-01 Aesthetics.docx <br />However, the proposed project would be subject to the requirements set forth by the California <br />Energy Code (CCR Title 24, Part 6). Compliance with the applicable lighting and energy requirements <br />established by the California Energy Code would ensure that light and glare from the proposed <br />project would not spillover onto adjacent land uses. Specifically, California Code of Regulations <br />Section 132 of Title 24, Part 6 regulates lighting characteristics such as maximum power and <br />brightness, shielding, and sensor controls to turn lighting on and off. These standards require <br />automatically controlled outdoor lighting so that it turns off during daytime hours and other times <br />when not needed. <br />Additionally, to further reduce impacts to less than significant, the proposed project would <br />implement Mitigation Measure (MM) AES-4, which would require adhering to a design review <br />process and the implementation of standards to minimize the proposed project’s daytime glare <br />contribution. Therefore, glare impacts would be less than significant with mitigation. <br />Level of Significance Before Mitigation <br />Potentially significant impact. <br />Mitigation Measures <br />MM AES-4a Adhere to Design Review Process and Standards <br />As part of the design review process for the proposed project, the applicant shall <br />include the following features in its design review submittal: <br />• Structures facing a public street or neighboring property shall use minimally <br />reflective glass, and other materials and colors used on the exterior of buildings <br />and structures shall be selected with attention to minimizing reflective glare. <br />• Building windows shall be tinted with an anti-reflective material. <br /> <br />Level of Significance After Mitigation <br />Less than significant with mitigation incorporated. <br />3.1.7 - Cumulative Impacts <br />The geographic scope of the cumulative aesthetics analysis is the visual area surrounding the project <br />site. The analysis also considers the foreseeable development projects listed in Table 3-1 (See <br />Chapter 3, Environmental Impact Analysis) in the City that would be visible from the project site. As <br />shown on Exhibit 3-1, there are no cumulative projects close enough to the project site to be visible <br />in conjunction with the proposed project. <br />The General Plan EIR found that General Plan buildout would not result in a significant impact to the <br />City’s visual identity, scenic resources, or light and glare after compliance with General Plan policies <br />and the Municipal Code. The General Plan defines areas that are considered scenic resources and
The URL can be used to link to this page
Your browser does not support the video tag.