Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Cultural Resources and Tribal Cultural Resources Draft EIR <br /> <br /> <br />3.4-26 FirstCarbon Solutions <br /> https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec03-04 Cultural-Tribal Cultural Resources.docx <br />Construction could result in the inadvertent exposure of buried archaeological resources. As such, <br />Mitigation Measure (MM) CUL-2 includes provisions for the inadvertent discovery of archaeological <br />resources, would reduce potential impacts to archaeological resources that may be discovered <br />during project construction to a less than significant level. <br />Operation <br />Impacts related to a project’s potential to cause a substantial adverse change in the significance of <br />an archaeological resource are limited to construction impacts. No respective direct or indirect <br />operational impacts related to archaeological resources would occur. <br />Level of Significance Before Mitigation <br />Potentially significant impact. <br />Mitigation Measures <br />MM CUL-2 The project proponent shall note on any plans that require ground-disturbing <br />excavation that there is a potential for exposing buried cultural resources including <br />prehistoric Native American burials. <br />The project proponent shall retain a Professional Archaeologist on an “on-call” basis <br />during ground-disturbing construction for the project to review, identify and <br />evaluate cultural resources that may be inadvertently exposed during construction. <br />The Archaeologist shall review and evaluate any discoveries to determine whether <br />they are historical resource(s) and/or unique archaeological resources under CEQA. <br />If any prehistoric or historic artifacts, or other indication of cultural resources are <br />found once the project construction is underway, all work shall stop within 20- <br />meters (66 feet) of the find. A qualified Archaeologist shall be consulted for an <br />immediate evaluation of the find prior to resuming groundbreaking construction <br />activities within 20 meters of the find. If the find is determined to be an important <br />archaeological resource, the resource shall be either avoided, if feasible, or <br />recovered consistent with the requirements of the California Environmental Quality <br />Act (CEQA) Guidelines. <br />Level of Significance After Mitigation <br />Less than significant impact. <br />Human Remains <br />Impact CUL-3: The proposed project could disturb human remains, including those interred <br />outside of formal cemeteries. <br />Impact Analysis <br />Construction <br />While no formal cemeteries are known to be in the project vicinity, there is one pre-contact resource <br />that has been recorded within a 0.5-mile radius of the project site that is known to contain human