Laserfiche WebLink
5 <br />Addendum to the Environmental Impact Report for <br />the Arroyo Lago Residential Project <br />City of Pleasanton <br />Cultural Resources Analysis <br />FCS will assess the potential for existing and undiscovered cultural and TCRs on the project site and provide a <br />comparative analysis to impacts identified in the County Project EIR. The results will be incorporated directly <br />into the appropriate sections of the Addendum (i.e., no stand-alone study will be prepared). This section will <br />include recommendations for further study and/or mitigation within the project area, as needed. Copies of all <br />correspondence and site survey photographs will be appended to the Addendum. Should the City request <br />additional field work or a stand-alone report, it would be covered under a separate Scope. FCS notes that <br />annexation may trigger the need for the City to re-engage in Tribal consultation per Senate Bill 18. Should the <br />City request FCS assistance with this consultation, it would be covered under a separate Scope. <br />Noise Impact Analysis <br />FCS will provide a comparative analysis to impacts identified in the County Project EIR prepared for the County <br />related to noise analysis to evaluate the potential construction and operational noise impacts on noise-sensitive <br />land uses in the project vicinity. The analysis will be qualitative in nature and will be wholly contained in the <br />Addendum and the supporting technical data will be appended to the document; no stand-alone report will be <br />prepared. Should the City request a quantitative analysis that would require additional modeling or a stand- <br />alone report, it would be covered under a separate Scope. <br />FCS will also review and update the County Project EIR Mitigation Monitoring and Reporting Program (MMRP) <br />to incorporate any relevant mitigation measures. <br />City Requests to be Addressed <br />Additionally, the Addendum will address the following items as requested by the City: <br />ƒThe annexation of the proposed project into the City, including related actions, such as the pre-zoning of the <br />project site; <br />ƒAny growth-inducing impacts related to annexation and connection to City utilities and services; <br />ƒIncorporation of information/analysis to address the City’s comments on the County Project EIR; <br />ƒIncorporation of the results of the City’s peer review on the applicant-provided Geotechnical Report; and <br />ƒIncorporation of information/analysis to sufficiently address the items raised in the recent comment letter <br />from the Dublin San Ramon Services District (DSRSD) to the County. <br />DELIVERABLE: <br />ƒElectronic copy (via email in Microsoft Word format) of the Administrative Draft Addendum to the City. <br />Task 5: Screencheck Draft Addendum <br />This Scope assumes that the City would provide one set of consolidated, vetted comments (with tracked <br />changes in the Word document) on the Administrative Draft Addendum. Once FCS receives these comments, <br />FCS will complete revisions and prepare a Screencheck Draft Addendum for review. <br /> <br />      Docusign Envelope ID: 7565F74F-BD3E-4CF2-8959-B6FB2748CD43