My WebLink
|
Help
|
About
|
Sign Out
USL PLEASANTON LAKES, LP. C/O STEELWAVE, LLC (FIRST CARBON SOLUTIONS)
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
U
>
USL PLEASANTON LAKES, LP. C/O STEELWAVE, LLC (FIRST CARBON SOLUTIONS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 11:52:13 AM
Creation date
12/9/2025 11:32:56 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
9/3/2025
LONG TERM AGREEMENTS - NAME
USL PLEASANTON LAKES, LP. CO/ STEELWAVE
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
FIRST CARBON SOLUTIO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Addendum to the Environmental Impact Report for <br />the Arroyo Lago Residential Project <br />City of Pleasanton <br />The project site as evaluated in the County Project EIR prepared consists of three Assessor’s Parcel Numbers <br />(APNs)—APN 946-4634-1 (the subdivision property itself) and two parcels (APN 946-4634-2 and APN 946- <br />1350-3-10) that would support off-site facilities/infrastructure. FCS understands that only the subdivision <br />property would be improved, since the off-site utility improvements would no longer be required for <br />development in the City. <br />Scope of Work <br />Based on preliminary review of available project information and consultation with the City, FCS anticipates that <br />an Addendum to the County Project EIR will be the appropriate level of CEQA review. If there are project <br />impacts that are new or more severe than what was analyzed in the County Project EIR, FCS will immediately <br />notify the City and applicant and prepare a new Scope to support preparation of an appropriate environmental <br />document. The following tasks are proposed to complete the identified Scope for an Addendum. <br />Task 1: Project Initiation and Kick-off Meeting <br />FCS will review relevant background material, develop an initial data needs list, and coordinate with the City to <br />schedule a kick-off meeting (it is anticipated that the kick-off meeting will be completed via teleconference). The <br />intent of the kick-off meeting is to clarify and confirm the details of the Scope and schedule, obtain any <br />additional copies of the project plans and other relevant information, and identify key points of contact. It is <br />typically helpful to have all relevant team members attend this call (i.e., applicant, civil engineering design <br />team, and general contractor, if applicable). FCS will also provide a Request for Information (RFI), which will <br />detail additional information needed to complete the CEQA analyses. An FCS Senior Air Quality Scientist will <br />also be available to attend this meeting to clarify data needs. <br />ASSUMPTIONS: <br />This Scope assumes that the City or applicant team will provide the following information to FCS prior to the <br />kick-off meeting: <br />Finalized site plan to be evaluated in the Addendum. FCS currently has site plans dated December 2, 2024 <br />Outline of any project changes. <br />Any updated or revised applicant-provided studies, if applicable. <br />Peer review of the applicant-provided Geotechnical Report. <br />Updated Computer-aided Design (CAD) files for the proposed project. This Scope assumes one round of <br />review with FCS’s Senior Geographic Information System (GIS) Specialist. Should additional rounds of <br />review be required, it would be covered under a separate scope. <br />Task 2: Comprehensive Project Description <br />Using the information obtained during project initiation, FCS will prepare a comprehensive Project Description <br />for the City’s review and approval. Pursuant to CEQA Guidelines Section 15124, the Project Description will <br />identify the project location, describe the project characteristics, identify necessary approvals, and list other <br />agencies that may use the document for environmental review. The Project Description will use graphics and <br />tables to clearly convey relevant information to the reviewer and will include all of the information required to <br /><br /> Docusign Envelope ID: 7565F74F-BD3E-4CF2-8959-B6FB2748CD43
The URL can be used to link to this page
Your browser does not support the video tag.