My WebLink
|
Help
|
About
|
Sign Out
PC-2025-16
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2025
>
PC-2025-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 10:30:44 AM
Creation date
12/23/2025 10:28:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/2025
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Peer Review of Geotechnical and Geologic Hazard Investigations BSK Project G2300051 <br />11991 Dublin Canyon Road (Hana Japan) September 6, 2024 <br />Pleasanton, California Page 4 <br /> <br /> <br />7. Geotechnical Report, Section 4.5 (Laboratory Testing): Corrosivity testing consisted of pH and <br />sulfate testing. It is a standard of practice to include resistivity testing as well. Consideration <br />should be given to conducting resistivity testing after mass grading to help assess corrosion <br />potential of buried metal. Depending on such test results, corrosivity mitigation measures may be <br />needed, such as wrapping utility piping that is sensitive to corrosion. <br />8. Geotechnical Report, Section 5.1 (Expansive Soil): This section states that thicker colluvium soil <br />was encountered on the eastern portion of the Site. Based on our review of the current <br />explorations at the Site, the western portion of the Site has thicker colluvium soil deposits. ENGEO <br />should evaluate whether this is a concern or not. <br />9. Geotechnical Report, Section 5.4.1 (Ground Rupture): Please refer to Comment #2.a above <br />regarding the recommended building fault setbacks. Figure 2 may need to be revised accordingly. <br />10. Geotechnical Report, Section 5.4.3 (2007 CBC Seismic Design Parameters): We understand these <br />parameters have been superseded by the those provided in the CBC Update Letter. However, <br />please refer to Comment #1 above regarding Site Class characterization and seismic design values <br />at the Site. <br />11. Geotechnical Report, Section 5.5 (Soil Corrosion Potential): Same as Comment #7 above <br />12. Geotechnical Report, Section 6 (Earthwork Recommendations): General Note: Throughout the <br />Geotechnical Report, when referring to earthwork recommendations, Section 4 is referred to. <br />These references should be updated to refer to the correct subsections in Section 6. <br />13. Geotechnical Report, Section 6.1 (Expansive Soil Mitigation): <br />a. In the statement that indicates no expansive clay should be placed within the upper 3 feet <br />of building pads, the top of the building pad should be defined such as finished subgrade <br />or bottom of slab. <br />b. This section of the report should state what type of soil material should be used to replace <br />expansive (soil) material that is removed from the upper 3 feet of the building pads. BSK <br />assumes the replacement soil material would consist of a low expansion potential soil <br />having a plasticity index of less than 12 per Section 6.5 of the Geotechnical Report. <br />14. Geotechnical Report, Section 6.5 (Acceptable Fill): This section states that on-site soil and rock <br />material is suitable as fill material. However, previous sections have indicated that the on-site soil <br />consists of expansive soil and that expansive clay should not be placed within the upper 3 feet of <br />building pads. Consideration should be given to clarifying what on-site soil and rock is acceptable <br />as fill material or clarifying where it can be used. In addition, this section indicated that fill material <br />should have a plasticity index of less than 12. Clarification should be given to whether this refers <br />to on-site soil or imported fill. <br />15. Geotechnical Report, Section 6.6.2.2 (Structural Areas) Note 2: It appears that the second <br />sentence in this note is incomplete. Please provide clarification if appropriate. <br />16. Geotechnical Report, Section 6.6.2.2 (Structural Areas): Consideration should be given to <br />eliminating the option to use native clay soils for pipe bedding and backfill where utility trenches <br />cross perimeter building foundations. Consideration should be given to only recommending sand <br />cement slurry for this purpose because it is very difficult to properly compact clayey soils under <br />the pipe haunches.
The URL can be used to link to this page
Your browser does not support the video tag.