Laserfiche WebLink
<br />Page 25 <br /> <br />findings. The applicant shall fund this effort and address any discovered network <br />deficiencies that are directly attributable to the development. <br /> <br /> It is assumed that the existing building is served from a sanitary sewer lateral <br />connected to the City’s main. If this lateral will no longer serve the site, it shall be <br />decommissioned at the main, with the pipe abandoned in accordance with Pleasanton <br />Standard Specification Section 3-03H “Utility Abandonment”. (Address this condition <br />prior to plan approval) <br /> <br />89. CLEAN WATER PROGRAM (LARGE PROJECTS). Because the project appears to <br />create and/or replace more than 10,000 square feet (0.23 acres) of impervious <br />surface, it is considered a Regulated Project according to Provision C.3.b of the <br />Municipal Regional Stormwater NPDES Permit that regulates stormwater runoff in <br />Alameda County. The Alameda Countywide Clean Water Program developed a C.3 <br />Guidance Manual to assist applicants in addressing these regulations. The Guidance <br />Manual is available for download at: <br /> https://cleanwaterprogram.org/development/ <br /> <br /> Regulated projects must include stormwater treatment measures in the site design to <br />remove pollutants from stormwater upstream of any connection to the City’s <br />stormwater conveyance networks. In addition, regulated projects must be subject to a <br />Stormwater Treatment Measure Maintenance Agreement between the City and <br />property owner or owner’s association to assure long-term maintenance of the <br />installed measures. The City will provide a template agreement. Once executed, the <br />agreement must be recorded against the property. (Address this condition prior to plan <br />approval) <br /> <br />90. STORMWATER BIORETENTION. (The applicant shall address the following <br />conditions prior to plan approval): <br /> <br />a. The drainage network relies on a pump to lift water from the buried pipe <br />network to the at-surface bioretention basin. Section G.1.1 of the Guidance <br />Manual specifically requires the pipe network to completely drain within 72 <br />hours of a storm event. The bioretention pump details meeting Section G.1.1 <br />shall be submitted with the construction documents design for City review and <br />approval. <br />b. Referring to the Guidance Manual, Section 8.1.1 “Design and Sizing <br />Guidelines” as well as the Geotechnical Investigation by Cornerstone Earth <br />Group Section 6.2, the recommended bioretention setback requirement from <br />structures is 10 feet. This recommendation is violated in several areas <br />according to the cross-sections on Sheet C2 of the Vesting Tentative Map. <br />While introducing an impermeable liner within the basin may address soil <br />saturation issues, the liner will not address the loss of soil bearing where the <br />Docusign Envelope ID: 52DE2131-F0C9-4C18-86DD-6B9E7ADA8792