My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING SUPPLEMENTAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
110425 REGULAR
>
CITY COUNCIL MEETING SUPPLEMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:06:33 PM
Creation date
12/26/2025 1:06:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/4/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installing high-intensity lighting within the setback directly conflicts with these <br />objectives. <br />In contrast, comparable properties cited by the applicant (on Trenery Drive) have greater <br />setbacks between poles and property lines and were developed under Alameda County, not <br />City, jurisdiction. <br />Those examples therefore do not establish valid precedent under Pleasanton’s zoning <br />authority. <br />5. Absence of Certification and Independent Verification <br />The report is unsigned and lacks certification by a licensed lighting professional or electrical <br />engineer. <br />Without a professional stamp or verification of compliance with IES and City standards, the <br />data cannot be considered technically reliable for decision-making. <br />6. Risk of Adverse Impacts Despite “Shielded” Fixtures <br />Even with shielding, high-wattage LEDs at 15 feet produce significant source brightness <br />visible from neighboring properties. <br />According to the International Dark-Sky Association (IDA), fixtures above 12 feet in <br />residential areas typically generate perceptible glare unless advanced optical controls are <br />used. <br />The report includes no evidence that such controls are in place. <br />Summary <br />The submitted lighting report fails to substantiate the applicant’s claim of “no glare or <br />spillover.” <br />Critical modeling data are missing, glare analysis is omitted, receptor-point measurements <br />are absent, and the proposed pole height violates the intent of the City’s setback and <br />compatibility standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.