My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
111825 REGULAR
>
CITY COUNCIL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 1:59:45 PM
Creation date
12/26/2025 1:52:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/18/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 10 <br />• Circulation Options: Two circulation approaches, a turnaround (cul-de-sac) option and a <br />loop option, are considered for the western portion of the site, between Site 1 and Site <br />2. The cul-de-sac option provides one entry and exit point and reduces potential <br />conflicts between vehicular traffic and pedestrians/cyclists. It also allows for more space <br />along the Iron Horse Trail for sidewalks and landscaping. However, it has a smaller <br />drop-off area and no commercial loading for businesses adjacent to the plaza. The loop <br />option does have an on-site drop-off area and loading space for commercial and <br />customer loading, but results in more paved area on the site (thereby reducing <br />developable area), and a second driveway near the Iron Horse Trail could result in <br />conflicts between motor vehicles and other modes of transit. <br /> <br />• Owens Drive Bicycle Lane Configurations: An off-street bicycle lane (located between <br />the sidewalk and drop-off areas, adjacent to building frontages) or an on-street bicycle <br />lane (located between vehicular traffic lanes and passenger drop-off zones) along <br />Owens Drive is also considered. While the on-street bicycle lane would provide <br />separation between bicyclists and pedestrians on the sidewalk, it would not provide <br />separation between the bicycle lane and through traffic on Owens Drive. In contrast, an <br />off-street bicycle lane would provide a separate space for bicyclists, offering fewer <br />opportunities for conflicts with vehicular traffic, while also sharing the space with <br />pedestrians and cyclists. <br /> <br />• Plaza: A new plaza, running parallel to the Iron Horse Trail would provide landscaping <br />and open space for seating and gathering. The plaza is situated over easements that <br />are not buildable due to utility lines that run through this area. Active uses would ideally <br />be located in close proximity to the plaza to help increase pedestrian presence and <br />encourage vitality. <br /> <br />• BART Rider Parking: As noted in this report, based on data collected in Spring 2025, <br />approximately 51 percent of the 1,352 vehicular parking spaces on the Pleasanton side <br />of the station are occupied on a regular basis. Using driver origin data, of the occupied <br />spaces, about 250 spaces are taken by Pleasanton residents (approximately 18.5 <br />percent of the total parking spaces). The Dublin side of the station also offers <br />opportunities for vehicular parking, including dedicated BART surface and garage <br />spaces, as well as additional spaces in a recently constructed (2024) Alameda County <br />parking garage. Given the density of residential development and the space required on <br />the site to accommodate parking for the housing units and any non-residential uses, <br />BART rider parking will be reduced from the existing 1,352 surface spaces. BART policy <br />also encourages and prioritizes non-vehicular modes of travel, including pedestrian, <br />bicycle, transit/shuttle, paratransit, and rider pick-up and drop-off. Further evaluation <br />and strategies to offset the loss of BART rider parking at the station are expected to be <br />forthcoming as part of a focused analysis on parking management and station area <br />access. BART, as the property owner and transit agency, will ultimately determine the <br />appropriate amount of replacement parking to serve its riders, balancing consideration <br />of the agency’s TOD policies and development objectives for the site. <br /> <br />With respect to parking, the reuse scenarios all assume some amount of BART rider <br />parking on-site, but do not assign a target or total parking supply number. Instead, the <br />scenarios include some flexibility through building design and phasing to accommodate <br />Page 114 of 399
The URL can be used to link to this page
Your browser does not support the video tag.