My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL MEETING SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
111825 REGULAR
>
CITY COUNCIL MEETING SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2025 2:01:00 PM
Creation date
12/26/2025 2:00:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/18/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 of 3 <br /> <br />The Housing Element also requires the Plan to assess potential complementary non- <br />residential uses and evaluate the vehicular parking demand of on-site uses, in addition to <br />BART rider parking. <br /> <br />MTC-ABAG Grant Funding <br />The grant funding from MTC-ABAG is to facilitate completion of the Concept Plan and <br />evaluation of parking (with special emphasis on BART rider parking) and station access. <br />The objective of the parking analysis is to “right-size” the number of parking spaces on the <br />site, balancing demand from BART riders and facilitating housing development consistent <br />with the densities assumed in the Housing Element and permitted by State law. The parking <br />evaluation effort has yet to commence, although MTC-ABAG has advised that it plans to <br />hold kick-off meetings in early 2026. The BART Concept Plan will evaluate how best to <br />incorporate these considerations following City Council input regarding the site re-use <br />scenarios at the November 18, 2025, City Council meeting. <br /> <br />BART Transit-Oriented Development Policy <br />Over the last several years, BART’s policy position on vehicular parking has substantially <br />shifted, with planning and funding priorities for station improvements and investments <br />increasingly focused on multimodal station access and TOD. The BART Board has adopted <br />a TOD Policy to provide a vision, goals, and strategies to further TOD around its stations. <br />BART has established a TOD Work Plan to analyze, among other things, market readiness, <br />local support for TOD, infrastructure needs, and development capacity, with the goal of <br />informing BART’s development priorities for its stations. <br /> <br />The Dublin-Pleasanton station is identified for the Tier 2 mid-term timeframe, meaning that <br />the Request for Proposals (RFP) to solicit developer interest will be issued in the 2029-2033 <br />timeframe. This straddles the end point for the 6th Cycle Housing Element, which is from <br />2023-2031. Accordingly, the first Memorandum of Understanding (MOU) with BART, which <br />aims to solidify the cooperative partnership between the two agencies, identifies that the <br />RFP for developer interest will be issued by 2028 or 2029 to facilitate the construction of <br />housing within the timeframe of the 6th Cycle Housing Element. <br /> <br />DISCUSSION <br />Concept Plan Parking Approach at Dublin-Pleasanton BART <br />To develop the site with housing, considering the objectives of the BART TOD Policy, along <br />with the City’s Housing Element goal, the site would have fewer vehicular BART rider <br />parking spaces than currently exist. If BART rider parking (retaining or increasing the <br />number of on-site spaces) is prioritized over the development of the site for housing, the <br />site’s ability to be counted as part of the inventory may be threatened. If so, the City may <br />need to reevaluate its Housing Element and potentially rezone sites in addition to those <br />already earmarked earlier this year. <br /> <br />The site re-use scenarios that will be presented to the City Council on November 18 each <br />assume that some BART rider parking will be provided with redevelopment (along with <br />parking to serve new residential and other uses). However, the concepts do not identify the <br />specific number of replacement parking spaces to be provided, but rather provide a degree
The URL can be used to link to this page
Your browser does not support the video tag.