My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />23 <br /> <br />6. Phasing <br /> <br />The phasing for development on the Pleasanton BART station property is somewhat flexible as <br />there are multiple potential areas which could be defined as individual phases of development. <br />There are a few strategies which inform the final phasing. <br /> <br /> <br />Considerations: <br />1. Whether any BART rider parking is maintained on the site and the location of the parking <br />may impact the phasing. If BART rider parking is to be provided, the funding for that may <br />take extended time, thus that location/site may need to go later in the phasing to allow time <br />to secure funding. However, any new BART rider parking would need to be built prior to the <br />final phase of development, since per BART policy, the overall parking number on site may <br />not dip below the final parking number. <br />2. If BART rider parking is located on Site 1 and built in the initial phase, it would free up the <br />remaining property for development, including Site 2 which fronts the station. <br />3. The largest eastern Site (3/4) is large enough to be a single development or multiple <br />developments. <br />4. If Sites 1 and 2 are developed first as a combined development (with or without BART rider <br />parking), it would make an immediate positive impact on the user experience for BART <br />patrons by implementing the new circulation, accessible drop-offs, and Owens Drive <br />frontage improvements. Developing Sites 2 and 3 first would similarly result in an immediate <br />positive impact with the new plaza and drop-offs along Owens Drive. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Applying these considerations to the test fits and phasing strategies, three fundamental <br />scenarios have been developed: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.