Laserfiche WebLink
Pleasanton BART October 9, 2025 <br />Site Re-Use Options Memorandum <br /> <br /> <br />25 <br /> <br />iii. Scenario P-2 <br />• Phase 1: Site 3 and 4 combined as a wrap garage residential development, potentially <br />with retail and BART rider parking. <br />• Phase 2: Site 1 as a wrap or podium with residential <br />• Phase 3: Site 2 as a podium mixed-use building with a small amount of retail or <br />commercial uses along the Iron Horse trail plaza. <br /> <br />Note: If in Phase 2 (Site 1) is a wrap building with or without BART rider parking, then Phase <br />3 (Site 2) would be one or two five-to-six-story mixed use buildings with five or more of <br />residential levels. <br /> <br /> <br />Figure 6-3: Phasing scenario P-2 <br /> <br />iv. Scenario P-3: All Podium Buildings <br />• All 4 sites would be phased as desired with each development primarily residential with <br />its own parking. Site 2 would have some retail / commercial uses. Each development <br />would be approximately 250+ units and sites 3 and 4 could be smaller buildings if the <br />parking ratio desired is substantially less than 1:1. While the location of BART rider <br />parking is shown on Site 1, it could also be located on Site 4. <br />The order of phasing of the sites is generally flexible. <br /> <br /> <br />Figure 6-4: Phasing scenario P-3