My WebLink
|
Help
|
About
|
Sign Out
FE CONTROLS CORPORATION
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
F
>
FE CONTROLS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 8:59:14 AM
Creation date
1/8/2026 8:46:44 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Goods and Services
Contract Type
New
NAME
FE CONTROLS CORPORATION
Contract Record Series
704-05
Munis Contract #
2026374
Contract Expiration
2/28/2027
NOTES
FIRE ALARM RETROFIT, PROJECT NOS. 23457 & 26386
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 6 <br />Operations and Maintenance and Utilities and Environmental Services Divisions, and the <br />Pleasanton Police Department’s training and storage functions (OSC-PD). The campus is <br />served by a zoned fire alarm system with a non-functioning control panel. Although the <br />buildings are fully sprinklered, this system does not monitor all of the exterior fire risers. <br /> <br />The scope of work at this location includes: <br />• Relocating the fire alarm control panel (FACP) <br />• Upgrading to an addressable fire alarm system with remote monitoring <br />• Adding a one-way voice communication system throughout offices, shops, and exterior <br />areas to enhance emergency response <br /> <br />Two additional OSC buildings, the LPFD Training Center and a one-story classroom <br />(approximately 2,500 square feet, built in 1988), are not sprinklered and are connected to a <br />separate unmonitored fire alarm system that also controls the training tower used for live-burn <br />activities. The scope includes a new addressable system and FACP with remote monitoring, <br />separated from the training tower system, which will remain in place. <br /> <br />Materials staging, waste bins, and contractor parking will be inside the OSC gates near Busch <br />Road, away from neighboring properties. Exterior work will follow city ordinance hours. Limited <br />disruption is expected to staff, with no impact on community services. The training tower, <br />miscellaneous site structures, emergency generator, and fuel tanks are not part of this project. <br /> <br />City Library - 400 Old Bernal Avenue <br />The Library, constructed in 1988 and remodeled in 2019, is the City’s largest building at <br />approximately 30,200 square feet. It is sprinklered and currently served by an outdated, zoned <br />fire alarm system with remote monitoring. <br /> <br />The scope of work at this location includes: <br />• Relocating the FACP and upgrading to an addressable system <br />• Adding devices to meet current code <br />• Replacing the underground backflow assembly with a new above-grade assembly <br /> <br />Interior work will occur outside public hours, and the Library will remain open during regular <br />hours. Impacts on staff will be minimal. Exterior work will follow city ordinance hours. Staging <br />will be secured within contractor-provided fencing, and a fire watch will be required when <br />systems are offline. The adjacent library storage building is not included in this scope. <br /> <br />Pleasanton Police Station - 4833 Bernal Avenue <br />The Police Station building, constructed in 1983 with additions in 1997, is approximately <br />20,300 square feet. It includes an elevator, fire sprinklers, and an original fire alarm system <br />monitored by Police Dispatch. <br /> <br />The scope of work at this location includes: <br />• Upgrading to an addressable fire alarm system <br />Docusign Envelope ID: 1D34CC79-5A3B-46B0-A38E-AB5F8C8EF441
The URL can be used to link to this page
Your browser does not support the video tag.