CITY OF PLEASANTON  TTCASANJ011431.2025 11 <br />PROPOSAL FOR <br />CITY OF PLEASANTON <br />QUIET ZONE <br />Kimley-Horn will consolidate the information gathered and the quiet zone analysis, summarizing the information in <br />a technical memorandum for the City, which can be referred to as the “Preliminary Evaluation Memorandum”. This <br />memorandum will detail the opportunities, constraints, and outline the options available for quiet zone implementation. <br />As there may be multiple design alternatives, this memorandum will narrow the focus down to two (2) alternatives for <br />consideration during the diagnostic review process. <br />Task 2 Deliverables <br /> ✓Preliminary Evaluation Memorandum, summarizing the opportunities, constraints, and options available for quiet zone implementation <br />TASK 3: CONCEPT DEVELOPMENT (15% DESIGN) <br />Kimley-Horn will prepare conceptual designs for the four at-grade crossings within the City, based on the determination <br />of alternatives as described in Task 2. While the quiet zone calculations as shown in the RFP indicate medians are the <br />minimum set of improvements required at Santa Rita Road such that the four crossings would be afforded Quiet Zone <br />status, Kimley-Horn will prepare conceptual designs for up to two (2) alternatives at each of the four (4) crossings. <br />These conceptual designs would be prepared prior to the field diagnostic meetings and would be provided to the City <br />for review and approval in advance. Kimley-Horn has found that providing concept plans, akin to a 15% design, to <br />the members of the Diagnostic Team in advance of the meeting provides an anchor point from which all discussion <br />can stem from. Having a concept design already prepared allows for a more efficient and collaborative field meeting, <br />minimizing subsequent back and forth on design iterations after the fact. This in turn expedites the plan development <br />process and schedule and leads to faster concurrence between permitting and stakeholder agencies. <br />To accompany the conceptual designs, Kimley-Horn will prepare a rough order of magnitude cost estimate to document <br />the expected construction costs associated with the various design alternatives. <br />Task 3 Deliverables: <br /> ✓Conceptual designs – two (2) alternatives per crossing <br /> ✓Rough order of magnitude cost estimates <br />TASK 4: STAKEHOLDER ENGAGEMENT <br />Kimley-Horn will support the City in engaging the various stakeholder agencies, including CPUC, UPRR, the FRA, and <br />ACE. In the early phase of the project, these meetings will serve to obtain key corridor and arterial roadway information <br />such as traffic volumes, train frequency and speeds, new project developments planned for the area, and crash history <br />at each location if available. During the final design phase, this engagement will be on an as needed and ongoing basis <br />to secure design approvals and required authorizations for the Quiet Zone. <br />TASK 4.1 – Diagnostic Meetings (Virtual and Field) <br />Kimley-Horn will schedule and facilitate a virtual pre-diagnostic meeting with the stakeholders, no more than one week <br />in advance of the field diagnostic meeting. In recent years, a virtual pre-diagnostic meeting has become an industry <br />standard and best practice. It allows the public authority and its representatives (in this case, the City and Kimley-Horn) <br />the opportunity to set a baseline for the topics of discussion while in the field. These discussions often include project <br />background, existing conditions information, and the purpose of the improvements. <br />Docusign Envelope ID: 2430EB25-F48A-45D4-91C5-9340C4FBB5C9