My WebLink
|
Help
|
About
|
Sign Out
PAKPOUR CONSULTING GROUP, INC. (#2026404)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
P
>
PAKPOUR CONSULTING GROUP, INC. (#2026404)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 9:28:57 AM
Creation date
2/12/2026 9:25:40 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
PAKPOUR CONSULTING GROUP, INC.
Contract Record Series
704-05
Munis Contract #
2026404
Contract Expiration
6/30/2030
NOTES
UTILITY PROGRAM MANAGEMENT AND PROJECT MANAGEMENT SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utilities Capital Improvement Program (CIP) Program Management Services <br />Exhibit A – Scope of Services <br /> <br />Exhibit A – Scope of Services A-5 of 16 <br />The CONSULTANT will establish and manage Performance Dashboards, potentially hosted on a <br />Microsoft SharePoint site, which will serve as the internal department status reporting for the <br />Program. The Performance Dashboard will be able to provide information to the Program Team <br />to generate both set-frequency (e.g., month, quarter, annual) reports as well as ad-hoc dynamic <br />reports. The CONSULTANT will provide monthly or ad-hoc program/project performance updates <br />to the City, which will identify highlights, risks, changes, any issues with schedule and budget, <br />and recovery recommendations. <br />The CONSULTANT will establish protocols to manage and administer a regular cycle for update, <br />analysis, and reporting along with ongoing development of project schedules to a standard level <br />of detail to include phases, major activities and milestones, and key deliverables; critical path <br />schedule analysis; and integration of designers’ and contractors’ schedules. The CONSULTANT will <br />establish protocols to promote coordination between program managers, project managers, and <br />City finance staff to ensure information is updated. <br />The CONSULTANT will establish best management practices for project managers to monitor <br />project costs from project initiation through closeout, so that any necessary adjustments can be <br />made. <br />Function 3 – Project Delivery & Engineering/Operations <br />Support <br />Phase 1’s scope of services associated with this function will include delivery of immediate <br />projects that are currently active in design or construction, before Phase 1’s Program <br />Management and Controls Systems are fully developed. For Phase 2, the CONSULTANT’S services <br />associated with this function will operate as defined by the Program Management and Controls <br />Systems developed in Phase 1. Generally, this Project Delivery & Engineering/Operations Support <br />function may include the following: <br />CONSULTANT will provide project managers who will be responsible for efficient delivery of <br />projects by managing consultants, contractors, cost, schedule, quality, risks, and change, and for <br />communication to the Program Management and City. Depending on City staff availability, City <br />staff may take on the role of a project manager. It is the responsibility of the project managers to <br />ensure risk and change are responsibly managed and reported. Project Managers will also provide <br />negotiation support to develop contracts that are acceptable to the City for all engineering, <br />construction, and construction management contracts. Project Managers will work with Program <br />Management and engineering consultants to identify permits, permit requirements, and timeline <br />so that a permitting schedule can be developed for each project. <br />Docusign Envelope ID: FEFC9AF2-1478-4B9F-806B-DF97B62C9BB3
The URL can be used to link to this page
Your browser does not support the video tag.