My WebLink
|
Help
|
About
|
Sign Out
CAROLLO ENGINEERS, INC. 3RD AMENDMENT (#2022494)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CAROLLO ENGINEERS, INC. 3RD AMENDMENT (#2022494)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 4:17:13 PM
Creation date
3/27/2026 3:32:39 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
CAROLLO ENGINEEERS, INC. (3RD AMENDMENT)
Contract Record Series
704-05
Munis Contract #
2022494
Contract Expiration
12/31/2026
NOTES
WATER SYSTEM MANAGEMENT PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE Ͱ of ͳ <br />In this chapter of the WSMP, Carollo will review and summarize key findings within the City’s current <br />planning efforts including, but not limited to, the ͮͬͮͬ Urban Water Management Plan, ͮͬͮͮ Water <br />Capacity Evaluation (i.e., distribution capacity), and ͮͬͮͭ Risk and Resiliency Assessment. Carollo will also <br />identify any planning gaps for the water system program and recommend/prioritize additional studies to be <br />performed within the next Ͳ years. <br />The City has already identified the following planning gaps which will be performed by Carollo under this <br />initial WSMP due to their high priority. <br />Asset Renewal and Replacement <br />Water Facilities ‐ Carollo will review and analyze existing information provided by the City to develop a <br />register of water facilities (e.g., wells, turnouts, pump stations, reservoirs, pressure reducing stations, etc.). <br />The register will contain key attributes for each facility such as original construction date, major <br />rehabilitation dates, size/capacity, replacement value and other key parameters determined to be necessary <br />for analysis. Carollo will then conduct a desktop evaluation that utilizes a risk‐based prioritization approach <br />that factors age, criticality and operator known areas of concern to establish a time based, rehabilitation <br />priority ranking profile of all facilities. For facilities identified as high priority, Carollo will then conduct a field <br />condition assessment using a multi‐discipline team of civil, mechanical, structural, electrical, and <br />instrumentation specialists. During the site visits, Carollo will discuss maintenance and operations history <br />with staff familiar with each facility. The assessment team will note potential problems, such as structural <br />deterioration, electrical and instrumentation issues, mechanical degradation, safety issues, and recommend <br />rehabilitation needs. For purposes of budgeting, Carollo assumes three days of field assessments. The <br />facilities targeted for assessment will be determined based on desktop prioritization including discussions <br />with City staff. The field condition assessments will be used to confirm the priority rankings and further <br />define the scope of improvements for the high priority facilities. <br />Water Distribution Mains – Carollo will conduct a desktop evaluation that utilizes a risk‐based prioritization <br />approach that factors pipe age, pipe material, criticality, and operator known areas of concern to establish a <br />time based, renewal and replacement priority ranking profile for the City’s water distribution mains. Carollo <br />will utilize existing information provided by the City via their GIS database to conduct this desktop <br />evaluation. <br />Carollo will document findings and recommendations in this chapter of the WSMP. <br />Regulatory Review <br />Carollo will summarize current and upcoming regulations that will impact the City’s water system program <br />during the span of the initial WSMP plan (i.e., Ͳ years). For each regulation, Carollo shall provide a <br />summary of the requirements, compliance timing, City’s current compliance outlook, and recommend <br />prioritized actions to achieve future compliance. Carollo will document findings and recommendations in <br />this chapter of the WSMP. <br />Task 9 – Operations and Maintenance <br />General <br />In this chapter of the WSMP, Carollo will review, summarize, and identify deficiencies/gaps with the City’s <br />current O&M practices and programs. Review will include, but not be limited to, those O&M practices and <br />programs shown in Attachment ͭ. Carollo will recommend a prioritized list of O&M practice and program <br />improvements with estimated implementation costs for each. This list shall integrate O&M related <br />recommendations made from the various planning efforts discussed in Task ʹ. The prioritized <br />improvements will be grouped into short‐term implementation (i.e., within next ͱ years) and long‐term <br />implementation (i.e., ͱ+ years). Short‐term implementation will include readily identifiable, high‐risk areas <br />Docusign Envelope ID: 271FE856-C5AE-4E67-BBDD-ED81F3311151
The URL can be used to link to this page
Your browser does not support the video tag.