Page 2 of 3 <br />BACKGROUND <br />The City distributes approximately 4,500 million gallons of treated water per year to <br />22,000 customers. The City has two sources of water supply: (1) treated surface water <br />and groundwater purchased from Zone 7 Water Agency and (2) groundwater from three <br />City owned and operated wells with a total pumping allotment of 1,140 million gallons <br />per year. The City’s distribution system consists of 20 storage tanks, 14 pump stations, <br />and over 300 miles of piping. The annual operating budget for the water system <br />program is approximately $29 million (capital improvement plan expenditures not <br />included). The City’s water system program requires management of various elements <br />including administration, planning, operations and maintenance, capital improvements, <br />resources, and financing. Attachment 1 provides an illustration of these program <br />elements. <br /> <br />DISCUSSION <br />To ensure the effective management of its water system, the City is preparing a WSMP <br />that will be a living document, reviewed every three years to evaluate its effectiveness <br />and comprehensively updated every six years. Initial development will occur in three <br />phases: <br /> <br />• Phase 1 – High Level Assessment of City’s Water System Program: This phase will <br />include utilizing the United States Environmental Protection Agency’s Effective Utility <br />Management guidance document to evaluate the City’s existing water system <br />program practices and make recommendations for improvements. <br />• Phase 2 – Develop Work Plan: This phase will develop a work plan to prioritize and <br />implement improvements based on the outcome of Phase 1. The work plan will <br />include a schedule that spans a minimum of six years so that it covers the time <br />period of the initial WSMP through the first comprehensive WSMP Update. The work <br />plan will prioritize activities to occur as part of the initial WSMP, activities to occur as <br />part of future WSMP updates, and activities that although guided by the WSMP will <br />occur through separate planning efforts (e.g., urban water management plans, water <br />rate studies, water connection fee studies, etc.). The work plan will recommend the <br />timing of these activities for proper integration. <br />• Phase 3 – Prepare Initial WSMP: The City will develop the initial WSMP in <br />accordance with the work plan from Phase 2. The WSMP will be organized by the <br />program elements shown in Attachment 1. Anticipated tasks to be included in the <br />initial WSMP include, but are not limited to: <br />o Establish goals, key performance indicators, and policies to guide the water <br />system. <br />o Review/summarize existing planning efforts (e.g., urban water management <br />plans, risk and resiliency assessments, water distribution capacity <br />evaluations, etc.), identify planning gaps, and perform high priority planning <br />tasks (e.g., establish an asset renewal and replacement program, perform a <br />regulatory review, etc.). <br />o Review/summarize existing operation and maintenance practices, identify <br />deficiencies, and perform high priority tasks (e.g., establish a standard <br />operating procedures program and competency-based training program). <br />o Recommend a prioritized list of actions, programs, and capital improvement <br />projects to be implemented to improve management of the water system. <br />Docusign Envelope ID: 271FE856-C5AE-4E67-BBDD-ED81F3311151