REGIONAL GROUNDWATER FACILITIES PROJECT <br />FEASIBILITY STUDY <br /> <br /> 30 Zone 7 Water Agency <br />December, 2025 <br /> <br />5. RECOMMENDED PROJECT AND NEXT STEPS <br />Based on the evaluation of project alternatives, Alternative 2 (Tennis and Hansen Wells) is identified as <br />the recommended project. Of the alternatives that passed the pass/fail criteria for minimum drought year <br />water production capacity, this alternative ranked highest following the scoring process. <br />LSCE understands that this regional groundwater project is being considered as a joint effort between the <br />City and Zone 7, reflecting the regional nature of groundwater planning and operations. It is important to <br />note that well production capacity and annual project yield presented herein are preliminary estimates <br />based on test well data and will need to be refined and confirmed upon installation and testing of the full- <br />scale production wells. <br />Design-bid-build (DBB) is assumed to be the primary project delivery method given both agencies’ <br />familiarity and experience with this approach. However, design-build (DB) may also be considered if the <br />agencies determine that early cost certainty or schedule acceleration is desirable. LSCE assumes the City <br />and Zone 7 will coordinate the preferred delivery method prior to initiation of the detailed design effort. <br />Implementation of Alternative 2 is anticipated to require approximately three to four years from completion <br />of the 10 percent design phase through construction and startup. Figure 12 illustrates the anticipated project <br />schedule, assuming a DBB delivery approach with drilling and civil improvement work implemented as <br />separate, phased efforts. Key components of Phase II include: <br /> Advancing the conceptual design from the 10% design level by further gathering additional City <br />and Zone 7 input to define specific well station layouts, pipeline alignments, and integration with <br />existing Zone 7 facilities. <br /> Progressing through phased design (e.g., 30%, 60%, 90%, Final) for the production wells, pipelines, <br />well station facilities, and related HCF upgrades. <br /> Securing necessary permits and approvals, including but not limited to California Environmental <br />Quality Act (CEQA) compliance, well drilling permits, utility service applications, and stormwater <br />and air quality permits. To prevent schedule delays, particularly those affecting the start of well <br />drilling, it is assumed that Zone 7 will lead CEQA compliance efforts and initiate related work <br />early, potentially prior to formal selection of the design consultant, as this activity is on the <br />project’s critical path. <br /> Procuring drilling and general civil contractors through a competitive bid process under the <br />selected project delivery method (e.g., design-build or design-bid-build). Construction of the wells <br />is expected to proceed separately and in advance of DWSRF funding approval, which would be <br />secured for the well pump station, pipeline, and HCF improvements. <br /> Constructing, equipping, and commissioning the Tennis and Hansen production wells, associated <br />station facilities, HCF upgrades, and transmission pipelines connecting the new wells with the HCF. <br /> Off-site distribution system improvements downstream of the HCF that may be triggered by the <br />increased capacity resulting from this Project are not included with Phase II but are being