Laserfiche WebLink
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 8 <br /> <br />Figure 5 Alternative 2 – Overview of Joint Groundwater Supply Improvements <br />3.2 Infrastructure Improvements <br />The infrastructure improvements for this alternative are described in the following sections. <br />3.2.1 City Distribution System Improvements <br />Table 3 summarizes the required improvements to the City’s distribution system under Alternative 2. <br />These projects were identified in Akel’s Hydraulic Analysis Results Package No. 1 (Revised) (Akel, 2025) and <br />are identical to Alternative 1.