My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 9 <br />Table 3 Alternative 2 City Distribution System Improvements <br />Improvement <br />Number(1) <br />Type of <br />Improvement <br />Size (inches) Length (lf) Cost Share <br />(Percentage) <br />Capital Cost, City <br />Share ($)(2) <br />TO-8 Turnout N/A N/A City (100%) 4,270,000(3) <br />F-1 Pipe 24 5,250 City (100%) 3,810,000 <br />F-2 Pipe 24 310 City (100%) 220,000 <br />F-6 Pipe 16 3,800 City (100%) 2,090,000 <br />F-7 Pipe 16 3,450 City (100%) 1,900,000 <br />Notes: <br />(1) The information presented in this table is from Akel’s Hydraulic Analysis Results Package No. 1 (Revised) (Akel, <br />November 2025). <br />(2) Costs provided in Akel’s Hydraulic Analysis Results Package No. 1 are from April 2023. According to Engineering News <br />Record’s 20-City Cost Index, market escalation from April 2023 to January 2026 is 6.6 percent. The costs provided in this <br />table are escalated to 2026 dollars and rounded to the nearest ten thousand. <br />(3) The capital cost for TO-8 was estimated by Carollo as detailed in Appendix B and supersedes costs provided by Akel. <br />3.2.2 Joint Groundwater Supply Improvements <br />The joint groundwater supply improvements include new groundwater production wells located at Tennis <br />Park (5801 Valley Ave, Pleasanton, CA) and Hansen Park (5697 Black Ave, Pleasanton, CA), a transmission <br />pipeline from the wells to the Hopyard Chloramination Facility, and improvements to the Hopyard <br />Chloramination Facility to increase Chloramination capacity. <br />As shown in Figure 5, Zone 7 and the City are considering two locations for the new well facilities within <br />both Tennis Park and Hansen Park sites and will continue to evaluate the locations within both parks <br />during final design. Selection of the well facility location will consider routine site access, special <br />operations and maintenance (O&M) access (i.e., portable generators, equipment removal with cranes), <br />storm drain capacity for pump-to-waste operation, ease of Pacific Gas and Electric (PG&E) service, and <br />noise ordinance (construction and operation). In addition, architecture and landscaping requirements at <br />both well facilities will be coordinated during final design to minimize visual impacts to park users and <br />nearby residents. <br />The well building facilities at both Tennis Park and Hansen Park will have an approximate footprint of <br />40 feet by 43 feet (1,720 square feet) and an approximate height of 25 feet. Equipment contained in each <br />well building will include the following: <br /> Wellhead and associated accessories. <br /> Well pump and associated piping and appurtenances. <br /> Water sampling station. <br /> 4160 volts medium voltage switchgear with integral transformer. <br /> 800 horsepower variable frequency drive. <br /> Low voltage panelboards and transformer. <br />As shown in Figure 5, most of the transmission pipeline is planned to be installed in Hopyard Road with a <br />portion in Hansen Drive. The pipeline alignment was identified as the preferred alignment by the City <br />during a meeting held on July 31, 2025. Approximately 2,920 lf of the transmission main is in
The URL can be used to link to this page
Your browser does not support the video tag.