My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 18 <br />Table 7 Evaluation Criteria Scoring Definitions <br />Score Water Supply Reliability Water Quality Reliability Ease of Expansion for Treatment Community and Environmental Impacts Implementation Schedule <br />5 The alternative can deliver greater than 3,500 <br />AFY and can exceed the max day supply of <br />4,400 gpm for both existing and future <br />conditions. Exceeding these goals provides <br />additional benefits to the City. <br /> Greatly improves system reliability during <br />drought conditions, redundancy for short-term <br />facility outages (planned and unplanned), <br />ability to mitigate impacts of emergency <br />outages occurring at the regional supply level <br />and reduces risk of low supply pressures at <br />turnouts. <br /> The alternative can deliver water quality at or <br />below current regulatory requirements. <br /> The alternative allows maximum flexibility in <br />source blending and locational delivery to aid in <br />the City's management of water quality within <br />the distribution season based on seasonal <br />changes. <br /> Future treatment occurs at a regional level. <br /> Minimal risk to availability of space, ease to <br />permit, ability to operate and cost. <br /> The alternative has minimal impacts to <br />community and environment during <br />construction. <br /> The alternative has minimal long-term impacts <br />to parks / City property use, nearby residents, <br />and the environment. <br /> The implementation schedule for this <br />alternative is minimal (2 years or less). <br /> <br /> Minimal potential for schedule delays with low <br />impacts to City. <br />3 The alternative delivers 3,500 AFY and a <br />maximum day supply of 4,400 gpm for both <br />existing and future conditions. <br /> Moderately improves system reliability during <br />drought conditions, redundancy for short-term <br />facility outages (planned and unplanned), <br />ability to mitigate impacts of emergency <br />outages occurring at the regional supply level <br />and reduces risk of low supply pressures at <br />turnouts. <br /> The alternative allows moderate flexibility in <br />source blending and locational delivery to aid in <br />the City's management of water quality within <br />the distribution season based on seasonal <br />changes. <br /> Future treatment occurs at project site(s). <br /> Moderate risk to availability of space, ease to <br />permit, ability to operate and cost. <br /> The alternative has moderate impacts to <br />community and environment during <br />construction. <br /> The alternative has moderate long-term <br />impacts to parks / City property use, nearby <br />residents, and the environment. <br /> The implementation schedule for this <br />alternative is moderate (3 years). <br /> Moderate potential for schedule delays with <br />moderate impacts to City. <br />1 The alternative cannot guarantee to deliver <br />3.500 AFY and the maximum day supply of <br />4,400 gpm for both existing and future <br />conditions. <br /> Does not improve reliability during drought <br />conditions, redundancy for short-term facility <br />outages (planned and unplanned), ability to <br />mitigate impacts of emergency outages <br />occurring at the regional supply level and <br />reduces risk of low supply pressures at <br />turnouts. <br /> The alternative allows minimal flexibility in <br />source blending and locational delivery to aid in <br />the City's management of water quality within <br />the distribution season based on seasonal <br />changes. <br /> Future treatment occurs off project site(s). <br /> High risk to availability of space, ease to <br />permit, ability to operate and cost. <br /> The alternative has significant impacts to <br />community and environment during <br />construction. <br /> The alternative has significant long-term <br />impacts to parks / City property use, nearby <br />residents, and the environment. <br /> The implementation schedule for this <br />alternative is lengthy (4 years and greater). <br /> High potential for schedule delays with high <br />impacts to City.
The URL can be used to link to this page
Your browser does not support the video tag.