My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 2 <br />shutdown use of Wells 5, 6, and 8 due to the detection of PFAS. As an interim solution, the City has <br />increased its water purchases from Zone 7 to offset the loss of its GPQ. Extension of this interim solution <br />into the long-term is Alternative 1 in this study. <br />In parallel to the interim purchase of water from Zone 7, the City developed the basis of design for the <br />PFAS Treatment and Wells Rehabilitation Project in August 2021. This project would return wells to <br />service, extend their useful life, and implement a centralized PFAS treatment facility. This project evaluated <br />rehabilitating Well 8, constructing new Wells 9 and 10 (near the locations of Well 5 and Well 6), and <br />constructing a centralized PFAS treatment facility. The project was advanced to the 50 percent design <br />level and then put on hold in October 2022. While the project was on hold, the City reviewed other <br />potential projects under the Water Supply Alternatives Study, which was completed in November 2023. <br />The Water Supply Alternatives Study identified implementation of new groundwater supply wells outside <br />the PFAS detection plume and in the Bernal Subbasin as the preferred option to restore its GPQ. <br />Concurrently, Zone 7 recognized the opportunity for a joint project that could both support the City’s <br />GPQ and enhance Zone 7’s overall drought resiliency and supply reliability for the region. With <br />recognition of potential regional benefits, the City and Zone 7 elected to evaluate the feasibility of the <br />New Joint Groundwater Project between City and Zone 7 in August 2024, and Luhdorff & Scalmanini <br />Consulting Engineers (LSCE) was hired as the lead consultant with technical/engineering support from <br />Carollo. LSCE and Carollo completed the technical feasibility evaluation of the Joint Project in December <br />2025. This joint project with Zone 7 is Alternative 2 in this study. <br />The City hired Carollo in January 2026 to also determine the feasibility of the City implementing its own <br />groundwater supply wells at similar locations to that of the Joint Project. The City Only Project is <br />Alternative 3 in this study. Carollo was then tasked with evaluating the three water supply alternatives to <br />determine the preferred alternative. <br />1.4 Project Goals <br />The City’s goals for this project are: <br /> Recover use of the City’s GPQ of 3,500 AFY. <br /> Reduce overall water supply and distribution costs. <br /> Improve water supply reliability, management of water quality, and ability to meet regulations. <br />SECTION 2 ALTERNATIVE 1 – BASELINE PROJECT <br />2.1 Project Overview <br />Alternative 1 assumes the City will continue to offset its GPQ with increased purchases from Zone 7 at the <br />wholesale rate as a long-term solution. This alternative does not include the construction of any new <br />groundwater supply facilities by the City but does require the construction of new distribution <br />improvements as described in Section 2.2 to reliably receive water from Zone 7’s transmission system and <br />convey to existing and future customers. Figure 1 shows the required City distribution system <br />improvements identified by Akel’s Hydraulic Analysis Results Package No. 1 (Revised) dated <br />November 2025.
The URL can be used to link to this page
Your browser does not support the video tag.