Laserfiche WebLink
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 3 <br /> <br />Source: Background water system map presented in Groundwater Supply Alternatives Hydraulic Analysis Results <br />Package No.1 Revised (November 2025) by Akel Engineering Group, Inc. <br />Figure 1 Alternative 1 – Overview of City Distribution Improvements <br />2.2 Infrastructure Improvements <br />This alternative requires improvements to the City’s distribution system piping and a new turnout from <br />Zone 7’s transmission system including a fluoridation facility. These infrastructure improvements are <br />described in the following section. <br />2.2.1 City Distribution System Improvements <br />Table 1 summarizes the required improvements to the City’s distribution system under Alternative 1. <br />These projects were identified in Akel’s Hydraulic Analysis Results Package No. 1 (Revised) (Akel, 2025), <br />which is included in Appendix A. Refer to Appendix A for more details of the analysis.