Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-85 <br /> <br /> <br />4.14.1. Discussion <br />4.14.1.1. Impact TRAN-1 <br />Initial treatment and treatment maintenance activities would take place within and adjacent to Augustin <br />Bernal Community Park in Alameda County, California. The Project would require limited vehicular traffic <br />along public roadways used to access existing fire roads and trails leading to the specific treatment areas. <br />Project-related traffic would include heavy-vehicle trips to haul equipment and materials and worker <br />commute trips to and from the treatment areas. Crew sizes would typically be less than 25 workers per <br />site, although multiple teams may be working at the same time. Crews would not be more than 45 workers <br />for prescribed burns. All treatments except herbivory would occur primarily on weekdays during daylight <br />hours only. During prescribed burning, crews would need to conduct some maintenance burning on <br />weekends to manage overall smoke impacts. As described in the project description and Section 4.12, <br />“Noise,” noise-generating treatment activities would occur during daytime hours and would be consistent <br />with the local ordinances of the City and Alameda County. Therefore, the increase of vehicle traffic on the <br />surrounding local roads would occur during allowed construction hours. <br />The number of truck trips and worker vehicle trips to and from the project area would vary based on the <br />size of the area being treated, the type of treatment being implemented, and the duration of the <br />vegetation treatments. No road closures would be necessary for the implementation of this project. The <br />CalVTP PEIR found traffic impacts to be less than significant because vehicle increases and road closures <br />during vegetation treatments are short-term, use existing roads, and are managed through traffic plans, <br />agency coordination, and safety measures that prevent conflicts with transportation policies. The <br />proposed temporary increases in traffic related to the Project are within the scope of the PEIR because <br />the treatment duration and limited number of vehicles associated with the proposed treatments are <br />consistent with those analyzed in the PEIR. The proposed treatments would not all occur concurrently, and <br />increases in vehicle trips associated with the treatments, particularly relating to commuting workers, <br />would be dispersed on multiple roads as the distance from the Project Site increases. SPRs applicable to <br />this treatment are AD-3 and TRAN-1. Implementing SPR AD-3 requires the treatments to be consistent <br />with local plans, policies, and ordinances, and SPR TRAN-1 requires that the project proponent implement <br />a traffic management plan (TMP) and that traffic control measures be placed on affected roadways during <br />Project treatment activities. With the implementation of these SPRs, the determination is consistent with <br />the PEIR and would not constitute a substantially more severe significant impact than what was covered <br />in the PEIR. <br />The inclusion of approximately 93 acres of land that is outside the CalVTP treatable landscape in the <br />proposed treatment area constitutes a change to the geographic extent presented in the PEIR. However, <br />the existing transportation conditions (e.g., roadways, road use) present in the areas outside the treatable