Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-86 <br /> <br /> <br />landscape are essentially the same as those within the treatable landscape because they continue from <br />roadways from within the treatable landscape and are under the same jurisdictions and would be subject <br />to the same programs, plans, ordinances, or policies regarding roadway facilities and closures. Therefore, <br />the transportation impact is also the same and would be less than significant with the implementation of <br />the same SPRs. This determination is consistent with the PEIR and would not constitute a substantially <br />more severe significant impact than what was covered in the PEIR. <br />4.14.1.2. Impact TRAN-2 <br />The project treatment activity that would have the potential to increase transportation hazards during <br />proposed treatment and maintenance activities would be the use of prescribed burning due to the smoke <br />produced, which could temporarily affect visibility on nearby roadways. The CalVTP PEIR found smoke- <br />related visibility impacts from prescribed burning to be less than significant because burns are carefully <br />planned and regulated through SMPs, weather-based burn scheduling, and traffic safety protocols that <br />minimize risks near roadways. Vegetation piles for burning would not exceed 20 feet in diameter. <br />Prescribed and pile burning would be conducted in compliance with CAL FIRE and the BAAD Regulation 5 <br />for open burning and burn day restrictions. The City would report site conditions and request approval to <br />burn through PFIRS, which serves as an interface between air quality managers, land management <br />agencies, and individuals that conduct prescribed burning in California. Moreover, project treatments <br />would reduce the density of vegetation along roads and trails, improving line of sight and safety of <br />motorists. SPRs applicable to this treatment are AD-3 and TRAN-1, described under Impact TRAN-1. The <br />project proponent would prepare and implement a TMP to avoid and minimize temporary transportation <br />impacts under this SPR. SPR TRAN-1 would also require the project proponent to monitor prescribed <br />burning operations and the associated smoke dispersion. Therefore, the project treatment activities would <br />not substantially increase hazards due to a design feature or incompatible uses, and impacts would be less <br />than significant. This determination is consistent with the PEIR and would not constitute a substantially <br />more severe significant impact than what was covered in the PEIR. <br />The project area includes approximately 93 acres of land that is outside the CalVTP treatable landscape. <br />While this constitutes a change to the geographic area considered in the PEIR, the existing environmental <br />conditions for the land outside the treatable landscape and on the land within the treatable landscape are <br />essentially the same. Further, the existing transportation conditions (e.g., roadways, road use) present in <br />the areas outside the treatable landscape are essentially the same as those within the treatable landscape <br />because they continue beyond the treatable landscape. Therefore, the potential to increase hazards is the <br />same for project areas outside the CalVTP treatable landscape as for areas within the treatable landscape. <br />As a result, the impact to increased hazards is also the same and within the scope of the PEIR. The Project <br />would result in a less-than-significant impact related to increasing road hazards and would not result in a <br />more significant impact than covered in the PEIR.