Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-87 <br /> <br /> <br />4.14.1.3. Impact TRAN-3 <br />The project treatments could temporarily increase VMT above baseline conditions because the project <br />access locations are in residential areas with small, local roadways, requiring vehicle trips to access the <br />treatment areas. Project-related traffic would include heavy-vehicle trips to haul equipment and materials <br />as well as worker commute trips to and from the treatment areas. The number of truck trips and worker <br />vehicle trips to and from the project area would vary based on the size of the area being treated, the type <br />of treatment being implemented, and the duration of the vegetation treatments. Should vehicles be given <br />landowner consent to stage on-site or in close proximity, the most VMT would occur at the beginning and <br />end of the Project to haul equipment in and out of the project area. Daily VMT would largely consist of <br />crew transportation to and from the site and, potentially, hauling removed material. This impact was <br />identified as potentially significant and unavoidable in the PEIR because implementation of the CalVTP <br />would result in a net increase in VMT. However, as stated in Impact TRAN-3 of the PEIR, individual projects <br />under the CalVTP are likely to generate fewer than 110 trips per day, which is expected to cause a less- <br />than-significant transportation impact for specific later activities, as described in the Technical Advisory on <br />Evaluating Transportation Impacts published by the Governor’s Office of Planning and Research <br />(Governor’s Office of Planning and Research 2018). According to the analysis methodologies presented in <br />the PEIR, projects that generate or attract fewer than 110 trips per day generally may be assumed to cause <br />a less-than-significant transportation impact. As presented in the PEIR, this amount would allow for up to <br />50 vehicles bringing crews and equipment to and from the project site and hauling materials away in a <br />single day. Because of the small sizes of the crews needed for the proposed project (not more than 45 <br />workers), the limited equipment needed, and the limited materials to be hauled in any one day, the total <br />VMT would not exceed 110 trips per day. Initial treatment would likely involve more vehicle trips than <br />subsequent maintenance. Additionally, vehicle trips for commuting workers would be dispersed across <br />multiple roadways, particularly as distance increases from the project site. Hiring local contractors would <br />be encouraged where feasible to reduce the amount of VMT. <br />Although the PEIR determined that individual vegetation treatments would likely be less than significant, <br />the overall impact was identified as potentially significant in the PEIR because implementation of the <br />CalVTP would result in a net increase in VMT attributable to the program as a whole. Because the Project <br />would generate VMT during implementation, it would contribute to the environmental significance <br />conclusion in the PEIR; therefore, this impact is considered significant and unavoidable. No SPRs apply to <br />this impact. As discussed for Impact AQ-1 in Section 4.3, Air Quality, the City would implement MM AQ-1 <br />to the extent feasible. MM AQ-1 would reduce the impact by encouraging workers to carpool and/or use <br />public transportation. However, due to the required equipment and number of employees (i.e., the <br />primary trip-generators associated with vegetation treatments) associated with the Project, it would not <br />be feasible to reduce VMT substantially. Therefore, the impact would remain significant and unavoidable.