Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-55 <br /> <br /> <br />STANDARD PROJECT REQUIREMENTS APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />Public Services and Utilities Standard Project Requirements <br />SPR UTIL-1: Solid Organic Waste Disposition Plan <br />For projects requiring the disposal of material outside of the treatment area, the <br />project proponent would prepare an Organic Waste Disposition Plan prior to <br />initiating treatment activities. The Solid Organic Waste Disposition Plan would <br />include the amount (e.g., tons) of solid organic waste to be managed on-site (i.e., <br />scattering of wood materials, generating unburned piles, and pile burning) and <br />transported off site for processing (i.e., biomass power plant, wood product <br />processing facility, composting). If the project proponent intends to transport <br />solid organic waste offsite, the Solid Organic Waste Disposition Plan would clearly <br />identify the location and capacity of the intended processing facility, consistent <br />with local and state regulations to demonstrate that adequate capacity exists to <br />accept the treated materials. This SPR applies only to mechanical and manual <br />treatment activities and all treatment types, including treatment maintenance. <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />N <br />Prior The City of <br />Pleasanton <br />The City of <br />Pleasanton <br />