Laserfiche WebLink
Page 2 of 3 <br />PTSAP started in earnest in July 2025. Staff is requesting that the City Council adopt the <br />PTSAP at the May 19, 2026 City Council meeting as a separate agenda item, with the SS4A <br />application contingent on having an adopted and current Transportation Safety Action Plan in <br />place. Jurisdictions submitting an SS4A Implementation Grant must complete a Self- <br />Certification Worksheet with their application package. Should the City Council not adopt the <br />separately agendized PTSAP on May 19, staff would not be able to submit the proposed <br />application. <br /> <br />DISCUSSION <br />The Fiscal Year 2026 SS4A cycle includes $687,809,874 available for project Implementation <br />Grants. The US DOT anticipates 40 to 70 awards, ranging from $2.5 Million to $25 Million <br />each. The grant pays 80 percent of the total project cost, while local agencies are required to <br />provide a 20 percent local match. TJKM Transportation Consultants aided City staff in <br />developing the PTSAP, and the application package for the SS4A Implementation Grant. <br />During the PTSAP development, the Santa Rita Road Safety Project was identified as a highly <br />competitive grant project. The Santa Rita Road Safety Project was presented to the Bicycle, <br />Pedestrian, and Trails Committee (BPTC) on April 27 to request support for the use of <br />Measure BB funds towards the local match for the project. The BPTC recommends that the <br />City Council authorize the application to the US DOT for the $25 million safety grant. The <br />BPTC noted the limited amount of Measure BB funds the City receives and requested that <br />Measure BB funds be used sparingly, but agreed that, if no other funding option is available, <br />supports a maximum contribution of $1,300,000 in Measure BB Pedestrian/Bicycle funds to the <br />project. <br /> <br />The Santa Rita Road Safety Project was presented to the PTSAP Stakeholder working group <br />at its fourth meeting on April 30th, 2026, and any recommendations from this working group <br />will be incorporated into the grant application. <br /> <br />The details of the Santa Rita Road Safety Project are shown in Attachment 1 and include <br />safety enhancements at signalized intersections for all roadway users, including eliminating <br />slip lanes, reducing pedestrian crossing distances, improving sight distance and visibility, and <br />improving bicycle crossing treatments. There are also proposed improvements along the entire <br />corridor to upgrade bicycle infrastructure, including converting existing bike lanes to elevated <br />cycle tracks and constructing new cycle tracks. <br /> <br />These improvements are expected to help the City reach its goal of reducing fatal and severe <br />accidents along the Santa Rita Road corridor, which experiences some of the highest numbers <br />of injury collisions in the CIty's roadway network, as outlined in the Pleasanton Transportation <br />Safety Action Plan. <br /> <br />EQUITY AND SUSTAINABILITY <br />Implementation of the grant, if the City's application is successful, advances Climate Action <br />Plan (CAP 2.0) Strategy TLU-2 E5. Complete Streets Program and the PTSAP. The project <br />and the PTSAP prioritize and take into account safety improvements that will benefit youth, <br />seniors, pedestrians and cyclists as well as motorists. Having a convenient, safe, and <br />comfortable multimodal transportation network is critical to supporting users of all ages and <br />abilities, improving transportation options, and benefiting the environment. <br /> <br />Page 167 of 908