My WebLink
|
Help
|
About
|
Sign Out
BUREAU VERITAS TECHNICAL ASSESSMENTS LLC
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
B
>
BUREAU VERITAS TECHNICAL ASSESSMENTS LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 10:39:23 AM
Creation date
5/28/2026 10:37:17 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
BUREAU VERITAS TECHNICAL ASSESSMENTS LLC
Contract Record Series
704-05
Munis Contract #
2026467
Contract Expiration
3/31/2027
NOTES
CONSULTANT PROVIDING ASSET MANAGEMENT SERVICES AND SOFTWARE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The initial discussions with City staff will include the <br />following elements: <br />• Roles and lines of communication between and within <br />both the City and BV. <br />• Protocols for interaction between all parties throughout <br />the project: Contact information should include the <br />office and cell numbers for a minimum of 2+ contacts <br />with the appropriate City staff and BV. <br />• Field assessment logistics: Normally, BV does not require <br />escorts to perform the field assessments, except where <br />escorts may be required within restricted areas. Outline <br />areas of City’s highest priority for any assessment to be <br />completed during any training phases, likely complexity <br />of assessment data processing, efficient workflow each <br />day of the assessment, and City requests. <br />• Protocol for handling paths not clearly designated on <br />the map, not collected due to construction, or otherwise <br />deemed inaccessible. (PROW Survey) <br />• Strategies for connectivity between isolated urbanized <br />areas. (PROW Survey) <br /> <br />Field schedules and facility management interviews will <br />be conducted once the schedule is approved by the City. <br />Once the field schedule is approved, BV will deploy trained <br />accessibility assessors with backgrounds in Landscape <br />Architecture, Architecture, Engineering, and Building <br />Systems for facility assessments. All field resources <br />assigned have been professionally trained in accessibility <br />assessments and have performed numerous assessments. <br /> <br /> Program Access and Policy Review <br />BV is experienced with the program access test defined in <br />Title II 35.150(b), and realizes that not all amenities are <br />required to be accessible. BV’s goal is to assist the City in <br />providing the most economically viable improvements for <br />its users. Through consultation with staff, stakeholder <br />surveys and our field observations, BV will provide barrier <br />removal recommendations to improve the amenities <br />necessary to comply with the applicable standards to <br />provide program access. <br /> <br />An assessment of the City’s programs will be performed. <br />The United States Department of Justice defines <br />“programs” as the “programs, services and facilities” of a <br />Title II entity. The current status of the City’s programs as <br />defined by the DOJ will be evaluated through discussions <br />with City staff and a review of documentation. The goal <br />mandated by Title II of the ADA is to ensure that <br />individuals with disabilities are not excluded from <br />services, programs, and activities because buildings are <br />inaccessible or other assistance is not available. Steps <br />needed to make programs accessible to disabled <br />individuals will be detailed, such as, providing sign <br />language interpreters to enable an individual with a <br />disability to obtain the service, or providing benefits <br />at an alternative accessible location in order to ensure that <br />individuals with disabilities receive the benefits or services. <br /> <br />BV will meet with the designated representatives of the City <br />to gather information from the various departments <br />regarding the access opportunities or problems which have <br />arisen in the past. BV will evaluate the issues and <br />experiences with respect to the provision of services to <br />people with disabilities. <br /> <br />A program survey will address issues with respect to the <br />delivery of accessible programs and services. A policy and <br />program review provides a greater scope of information <br />about structural changes required for barrier removal. <br /> <br />The list of public programs and methods of communication <br />with the public has not been provided to BV as part of the <br />City’s request for a proposal. As such, BV has limited the <br />review of said programs and communications to eighty <br />(80) man hours. BV will work with the City to prioritize <br />the review to those programs with the highest impact to <br />the community. <br /> <br />It is possible that the program assessment will determine <br />that providing full access to a given program, service or <br />activity is simply not possible. In such a case, BV will work <br />with the City to determine if providing full access to the <br />program would be an “undue financial and administrative <br />burden.” Determinations regarding a finding of an “undue <br />financial and administrative burden” require specific <br />documentation as set forth in the Title II regulations. <br /> <br /> Public Outreach <br />Community engagement is an essential part of creating a <br />successful Transition Plan and Policy Procedure Guideline. <br />BV with work with the City to seek input from Staff, the <br />general public, and the accessible community. This input <br />is critical for understanding how facilities are actually <br />being used and how to increase usability. Early <br />engagement increases community awareness, <br />engagement after the draft Transition Plan increases buy- <br />in from the community, especially those advocating for <br />accessibility. <br /> <br />The community engagement results and the City’s ADA <br />Compliance Team’s advice will be incorporated into the <br />Transition Plan. The Transition Plan can establish phases <br />of barrier removal, without a calendar timeframe. To the <br />extent that a facility, program, service, or activity is not <br />going to be fully accessible to and usable by people with <br />disabilities in the immediate future, we will work with the <br />ADA Compliance Team to determine the best interim <br />procedure or policy in order to enhance accessibility to <br />the maximum extent possible. <br />Docusign Envelope ID: 7CF951A9-F5A4-4F8B-B02B-90C4522C309B
The URL can be used to link to this page
Your browser does not support the video tag.