My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Agenda Packet 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:22:28 AM
Creation date
7/8/2026 11:15:26 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P18-0078, P18-0080, P18-0081, PUD-130 and Tract 8569 (Hidden Canyon) Planning Commission <br />18 of 28 <br />space access, along with required sidewalks along the Dublin Canyon Road frontage of Lot 30 <br />and within the EBRPD access area to support future connectivity. <br />The applicant will also be making a monetary contribution in the amount of $500,000 to be <br />used by the City for future improvements to Dublin Canyon Road, including the potential <br />widening of the Devaney Creek bridge in order to improve traffic circulation and enhance <br />public safety. <br />INFRASTRUCTURE IMPROVEMENTS <br />The proposed project would be served by water from the City, via connection to the Moller 770 <br />Pressure Zone, with the installation of a water booster pump station located near the entrance <br />of the EVA on Dublin Canyon Road. Eight-inch water mains are proposed along Streets A and <br />B, continuing along the EVA portion of Street A, and also within Court C. An 8-inch water main <br />is also proposed to follow both the private and public roads surrounding the proposed Lots 29 <br />and 30, connecting the roads along Dublin Canyon Road. Water would also be provided to the <br />facilities at the proposed EBRPD Staging Area, though no sewer connection will be necessary <br />for the EBRPD vaulted restroom as it will be pumped and maintained for cleanout by the <br />EBRPD. <br />CLIMATE ACTION PLAN <br />In 2022, the City adopted Climate Action Plan (CAP) 2.0. The CAP 2.0 was reviewed by the <br />Bay Area Quality Management District (BAAQMD) and was deemed a “Qualified Greenhouse <br />Gas Reduction Strategy” in accordance with the District’s CEQA guidelines. Implementation of <br />the CAP will occur over several years. The CAP consists of amendments to regulations and <br />policies related to Land Use and Transportation, Energy, Solid Waste, and Water and <br />Wastewater, which result in reductions in greenhouse gas emissions in compliance with the <br />targets set by AB 32, California’s Global Warming Solutions Act of 2006. <br />Staff completed an analysis of how the proposed project is consistent with or implements the <br />applicable measures outlined in the City of Pleasanton’s CAP. The proposed project is <br />consistent with multiple goals and strategies outlined in the CAP, specifically within the <br />Buildings & Energy, Transportation & Land Use, and Water Resources sectors. <br />The project supports Strategy BE-1 (Advance the decarbonization of buildings) through the <br />incorporation of all-electric residential units, consistent with Supporting Action P1, which <br />promotes all-electric new construction and reduces greenhouse gas emissions associated with <br />natural gas use. The project also aligns with Strategy BE-3 (Expand use of renewable energy), <br />as the future residential development would be subject to State and local requirements for <br />solar readiness and energy efficiency. With respect to land use and transportation, the project <br />is consistent with Strategy TLU-2 (Advance active, shared, and public transportation) and <br />Strategy TLU-3 (Advance sustainable land use) by clustering residential development within <br />the City’s Sphere of Influence,facilitating efficient infrastructure extension, and incorporating <br />pedestrian and bicycle improvements along Dublin Canyon Road that support reduced vehicle <br />miles traveled (VMT). <br />Furthermore, the project is consistent with Strategy WR-1 (Improve water supply and increase <br />conservation) and Strategy WR-2 (Improve stormwater resilience) by incorporating water- <br />efficient fixtures, compliance with State water efficiency standards, and on-site stormwater
The URL can be used to link to this page
Your browser does not support the video tag.