My WebLink
|
Help
|
About
|
Sign Out
WOOD RODGERS, INC. (#2026579)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WOOD RODGERS, INC. (#2026579)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2026 10:59:58 AM
Creation date
7/16/2026 10:58:28 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Design Professionals
Contract Type
New
NAME
WOOD RODGERS, INC.
Contract Record Series
704-05
Munis Contract #
2026579
Contract Expiration
12/31/2027
NOTES
CALTRANS PERMITTING OF BICYCLE AND PEDESTRIAN IMPREOVEMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP: City of Pleasanton, I-580 Overcrossing Bicycle & Pedestrian Improvements (CIP #22570) | 17 <br />Task 4.4 – 65% Plans & EsƟmate <br />Wood Rodgers will advance the design of the bike and <br />pedestrian improvements shown on the conceptual plans <br />and develop 65% project plans and construction cost <br />estimates for each location. <br />Preparation of the project plans will be consistent with the <br />City of Pleasanton and Caltrans Standards. Wood Rodgers <br />will perform an internal QA/QC review of the plans prior <br />to submittal to the City. <br />The project plans will include electrical plans for the <br />installation of the Rectangular Rapid Flashing Beacons and <br />Pedestrian Hybrid Beacon shown on the concept plans, as <br />well as the relocation of the street lights. <br />The anticipated number of plan sheets to be prepared for <br />the improvements are listed in the table below: <br />SHEET TITLE SCALE COUNT <br />Title Sheet N/A 1 <br />Typical Cross SecƟons N/A 3 <br />Key Map / Control Sheet 1”=100’ 1 <br />Plan and ProĮle 1”=50’ 6 <br />ConstrucƟon Details 1”=10’ 12 <br />UƟlity Plan 1”=50’ 6 <br />Stage ConstrucƟon/Detour Plans 1”=100’ 3 <br />Signing and Pavement DelineaƟon 1”=50’ 6 <br />Electrical Plans 1”=50’ 12 <br />TOTAL 50 <br />Task 4.5 – 95% Plans, SpeciĮcaƟons & EsƟmate <br />Following the City review of the 65% submittal, we will <br />update the project plans and estimate and prepare <br />responses to each comment received. Along with the <br />updated plans and estimate, we will assemble and edit <br />the Caltrans Standard Special Provisions for the bid items. <br />Task 4.6 – Final Plans, SpeciĮcaƟons & EsƟmate <br />Following the City review of the 95% submittal, we will <br />update the project plans, Special Provisions, and cost <br />estimate for the Final submittal. We will prepare <br />responses to each comment received. <br />Task 4 Deliverables <br />• Traffic Operations Analysis Report <br />• Storm Water Data Report (Short Form) <br />• Transportation Management Plan <br />• 65% P&E, 95% PS&E, Final PS&E (PDF) <br />• Pending Resident Engineer File <br />• Supplemental PS&E Materials <br />• QA/QC Plan Check and Review Documents at Each <br />Submittal <br />TASK 5 – DESIGN ENGINEERING <br />EVALUATION REPORT <br />The Design Engineering Evaluation Report (DEER) will be <br />prepared in accordance with the Guidelines provided in <br />Appendix I of Caltrans’ Project Development Procedures <br />Manual. Wood Rodgers will serve as the primary contract <br />to Caltrans in the preparation, review, and approval of the <br />DEER <br />Task 5.1 – Prepare DEER <br />The key factors for a project to use the DEER as a project <br />initiation and approval document are: <br />• The project qualifies for a Categorical Exemption for <br />CEQA and Categorical Exclusion for NEPA, or the <br />project does not result in an increase in Vehicle <br />Miles Traveled if a higher level of environmental <br />document is required. <br />• The project has a single-build alternative <br />• No CTC action is required <br />• No FHWA approval is needed due to a change in <br />access control or right of way relinquishment <br />• No bridge widening or new structures that are not <br />constructed per Caltrans’ Standard Plans are <br />proposed <br />The supporting documentation that is required to be <br />submitted with the DEER includes: <br />• Right of Way Data Sheet for utility conflicts, any <br />acquisitions, or temporary construction easements <br />(no acquisitions or TCE’s are anticipated) <br />• Quality Management Plan describing quality <br />control and assurance activities <br />• Design Standard Decision Document to document <br />the justification for any nonstandard design <br />features <br />• Exhibits to supplement the findings of the DEER, <br />such as the location map, layout plans and typical <br />cross sections. <br />• An approved CEQA/NEPA document <br />• Traffic and Collision Analysis summarizing the <br />current and forecasted traffic volumes, as well as <br />the history of collisions within the project area <br />• A maintenance agreement and any other permits <br />Wood Rodgers has extensive experience in the <br />preparation of Project Initiation and Project Approval <br />documents for local agencies working with Caltrans, most <br />recently having prepared a DEER for a Class I shared-use <br />Docusign Envelope ID: 51FAFAD2-C432-8610-82B1-8C74A5863E3EDocusign Envelope ID: CF4E9CB2-CD8E-8250-8118-86FF73955901
The URL can be used to link to this page
Your browser does not support the video tag.