Laserfiche WebLink
Page 4 of 8 <br /> <br />Pleasanton’s proposed improvements terminate at the City of Dublin limits on the northern end <br />of each overcrossing. Dublin separately proposes to improve pavement conditions and <br />address bicycle facility gaps north of each overcrossing at Dougherty Road, Hacienda Drive, <br />and Tassajara Road between the Dublin City limit and Dublin Boulevard through their Local <br />Street Resurfacing at I-580 Interchanges Project. <br /> <br />In consultation with Alameda CTC, staff determined that a joint application between the Cities <br />of Pleasanton and Dublin would elevate the project, as it would represent a regional <br />partnership that provides cross-jurisdictional connections. Dublin’s estimated construction cost <br />for resurfacing and bicycle improvements in their jurisdiction is $3,370,000. <br /> <br />Under this approach, the City of Pleasanton would serve as the lead agency, with the City of <br />Dublin participating as a partner and remaining closely involved to ensure integration with their <br />planned improvements. Dublin would provide a Letter of Commitment to support the <br />application. <br /> <br />The combined estimated construction cost is $5,950,000. For the City of Pleasanton’s portion <br />of the project, staff recommends using future Transportation Development Act (TDA) Article III <br />funds for the $645,000 required local match. Dublin’s local match is $842,500, which will be <br />provided through their Measure BB Local Sales Tax. The total request for 2028 Alameda CTC <br />Comprehensive Investment Plan funds for both projects is $4,462,500. <br /> <br />If awarded, staff will return to the City Council with a Memorandum of Understanding, and a <br />cost-sharing agreement with the City of Dublin, and will update the project description for CIP <br />22570 to include the work in Dublin. <br /> <br />4) Pleasanton Transportation Technology Upgrade <br />The fourth project addresses a series of investments to upgrade and improve the City's <br />transportation technology: <br /> <br />• Fiber Optic Upgrades. During the 1980s and 1990s, approximately 17.5 miles of copper <br />traffic signal interconnect line was installed throughout the city, primarily in the Hacienda <br />Business Park, and along Foothill Road and Santa Rita Road. As traffic and <br />transportation technology have expanded, the performance of the traffic signal <br />interconnect decreased with additions to the traffic network, such as cameras, video <br />detection, and intersection analysis devices, resulting in communication delays between <br />the City’s traffic operations center and field devices. The decrease in performance also <br />limits the City's ability to add new technology to the network. Staff proposes replacing <br />7.5 miles of copper interconnect in key corridors with fiber-optic interconnect, which <br />provides superior bandwidth, zero electromagnetic interference, and longer reach than <br />copper. <br /> <br />• Traffic Signal Controller Upgrades. Along with the fiber optic upgrades, the City will <br />replace aging traffic signal controllers at 15 intersections on Foothill Road, Stoneridge <br />Drive, Bernal Avenue, Hopyard Road, Owens Drive, and West Las Positas Boulevard. <br />The traffic signal controllers are nearing the end of their useful life, and staff <br />recommends proactively upgrading these devices before they fail. <br />Page 39 of 923