Laserfiche WebLink
City of Pleasanton <br />May 11, 2026 <br />Page 2 <br /> <br />Following completion of the inspection, SCS will prepare a comprehensive report of findings. The <br />report will summarize the inspection process, participating departments, and observations made <br />during the site visit. Any identified issues of non‑compliance will be clearly described and organized <br />by regulatory program or department. Where feasible, SCS will outline recommended corrective <br />measures to address noted deficiencies and align facility operations with permit requirements. <br />Task 2 – PGS Design Reviews <br />SCS will review the proposed drawings and supporting design materials for the PGS Transfer Station <br />and provide the City with technical comments focused on operational feasibility, safety and <br />efficiency, consistency with industry best management practices, cost of service implications and <br />impact to the surrounding community. The review will be completed in coordination with the City's <br />Planning and Public Works staff at key design deliverable stages, assumed to occur at the 30%, 60% <br />and 90% design levels (approximately). <br />The design review process will focus on key elements at each design phase as detailed below. <br />Preliminary (30%) Design Review: <br />• Facility, site layout and traffic patterns for public, commercial and operations vehicles <br />and access for emergency services <br />• Queuing areas <br />• Capacity analysis <br />• Infrastructure repairs <br />• Staging, parking and material storage areas <br />• Plan for implementation/staging of improvements <br />• Significant equipment changes <br />• Significant operational changes <br />• Setback requirements, land use considerations and considerations of surrounding land <br />uses <br /> <br />Draft (60%) Design Review: <br />• All elements included in preliminary design review with significant changes made after <br />review <br />• Design drawings, details and design decision points <br />• Site grading, drainage and stormwater control/management <br />• Utility changes and impacts <br />• Construction cost estimates <br />• Equipment cost estimates <br />• Operational cost estimate implications <br />• General compliance with solid waste regulations, operating and permitting requirements <br /> <br />Final (90%) Design Review: <br />• All elements included in draft design review with changes made after review <br />• Added design drawings, details and decision points <br /> <br />Docusign Envelope ID: F16F78DC-0519-8237-830C-9B7D5391A9A3