My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />128 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />would be reduced accordingly, would adhere to all applicable federal, State, and local laws and <br />regulations while utilizing hazardous materials for construction. This would include, but not be limited <br />to, requiring compliance with Pleasanton General Plan Public Safety Element Policy 16 (“Regulate <br />the transportation, delivery, use, and storage of hazardous materials within the city limits”) and Policy <br />17 (“Ensure that hazardous materials are not released as a result of construction activities and that <br />any existing hazardous materials and potential contamination are remediated prior to development”). <br />Therefore, the proposed project would not introduce new significant impacts or create substantially <br />more severe significant impacts than those previously identified in the Prior FEIR. No additional <br />analysis is required. <br />d) Hazardous Materials Sites <br />Would the project: Be located on a site which is included on a list of hazardous <br />materials sites compiled pursuant to Government Code Section <br />65962.5 and, as a result, would it create a significant hazard to the <br />public or the environment? <br />Prior FEIR Conclusions <br />The Prior FEIR determined that the project site is located on a list of hazardous materials sites (the <br />Cortese List). The Cleanup Program Site at the project site is currently open and is undergoing long- <br />term management as of 2026. Long-term management refers to ACDEH’s continued oversight of the <br />project site until it verifies that all soil import, restoration, and reporting requirements are fully satisfied <br />and the case can be formally closed. The ACDEH has concluded that potential environmental impacts <br />from former mining operations have been adequately investigated and delineated and found not to <br />present an adverse risk to human health or the environment. <br />The Prior FEIR found that construction activities associated with the County Project could expose <br />contaminants to workers, the public, or the environment if not properly managed. Compliance with <br />COA HAZ-4a through COA HAZ-4e established by ACDEH and all applicable laws and regulations <br />associated with development on hazardous materials sites would reduce any potential impact <br />associated with the project site being located on a site included on the Cortese List. Additionally, the <br />County Project would be subject to ongoing regulatory requirements. Therefore, the Prior FEIR <br />concluded that impacts would be less than significant. (Draft EIR, pp. 3.8-21, 6-16). <br />Proposed Project Analysis and Conclusion <br />The hazardous materials conditions of the project site and related analysis identified in the Prior FEIR <br />for the County Project would apply to the proposed project as well. Because the project site is located <br />on the Cortese List, the proposed project would be required to comply with COA HAZ-4a through <br />COA HAZ-4e from ACDEH, which include coordinating with ACDEH prior to and during site <br />development by submitting the soil management protocols, project schedule, soil import <br />documentation, stockpile information, and soil excavation report. With the implementation of these <br />COAs, as well as applicable provisions of the Pleasanton General Plan, as noted above, the <br />proposed project would have less than significant impacts, consistent with the analysis and impact <br />conclusions in the Prior FEIR. Therefore, the proposed project would not introduce new significant
The URL can be used to link to this page
Your browser does not support the video tag.