Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />164 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />b) Police Protection <br />Would the project: Result in substantial adverse physical impacts associated with the <br />provision of new or physically altered governmental facilities, need <br />for new or physically altered governmental facilities, the <br />construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response <br />times or other performance objectives for any of the public <br />services: Police protection? <br />Prior FEIR Conclusions <br />The Prior FEIR determined that the Alameda County Sheriff’s Office would provide law enforcement <br />services from its Eden Township Substation. Although the substation has limited staffing and <br />response times exceed the County’s performance objective, the Sheriff’s Office did not identify a need <br />for new or expanded physical facilities to serve the County Project. While the County Project would <br />incrementally increase demand for police services, CEQA does not consider staffing deficiencies <br />alone to be a physical environmental impact; rather, it is only when the subject project demand would <br />trigger the need for new or physically altered facilities in order to maintain acceptable response times, <br />the construction of which could cause significant impacts, which is not the case with respect to the <br />County Project. <br />In evaluating annexation of the project site to the City, the Prior FEIR, in Alternative 2, determined that <br />demand for public services would be the same as the County Project, but some service providers <br />would change to those of the City, and impacts would remain less than significant. (Draft EIR, pp. 6- <br />18, 6-19). Therefore, the Prior FEIR concluded that impacts would be less than significant. (Draft EIR, <br />pp. 3.13-13, 6-18, 6-19). <br />Proposed Project Analysis and Conclusion <br />The proposed project would be served by the Pleasanton PD. While the proposed project could result <br />in an increased demand for police protection services to a certain degree as compared to existing <br />conditions, as was previously evaluated in the Prior FEIR, the proposed project would be required to <br />comply with the applicable policies and programs of the General Plan that would ensure that police <br />protection services keep pace with new development. For example, Program 2.1 of Policy 2 under <br />Goal 3 in Chapter 6 (Public Facilities and Community Programs Element) and Program 26.2 of Policy <br />26 under Goal 8 in Chapter 5 (Public Safety Element) require new development to pay its fair share of <br />costs associated with site acquisition and facility improvements for municipal services, as well as <br />police safety improvements. The proposed project would also be required to pay the capital facilities <br />fee outlined in Chapter 3.22 of the Municipal Code, which would ensure that the proposed project <br />contributes its pro rata fair share toward future planned police services/facilities. <br />The addition of approximately 588 residents would not, by itself, necessitate the construction of new <br />police stations or substantial expansion of existing police facilities. Police service demands <br />associated with population growth in the City are generally addressed at this new level of <br />demand through long-range planning, staffing adjustments, and incremental facility upgrades funded