My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br /> ADDENDUM <br /> <br /> <br />188 FCS <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />c) Wastewater Treatment Capacity <br />Would the project: Result in a determination by the wastewater treatment provider <br />which serves or may serve the project that it has adequate capacity <br />to serve the project’s projected demand in addition to the provider’s <br />existing commitments? <br />Prior FEIR Conclusions <br />The Prior FEIR found that the County Project would construct its own on-site WWTP with a capacity <br />to treat approximately 50,000 gpd. The Prior FEIR determined that this treatment capacity would have <br />enough capacity to serve the proposed project’s expected wastewater generation, and no new or <br />expanded wastewater treatment or conveyance facilities would be required beyond those provided in <br />the County Project. The WWTP would be a membrane bioreactor treatment plant capable of <br />producing disinfected tertiary recycled water as defined in California Code of Regulation, Title 22, <br />Section 60301.230. Disinfected tertiary recycled water produced by the wastewater treatment facility <br />would be stored in lined storage ponds and would be disposed of through irrigation of agricultural <br />irrigation fields. The WWTP would be sized to meet the County Project’s needs and would not rely on <br />external wastewater providers. Regulatory compliance with the RWQCB would be required. <br />Therefore, the Prior FEIR concluded that impacts would be less than significant. (Draft EIR, pp. 3.17- <br />17, 6-22–6.24). <br />Proposed Project Analysis and Conclusion <br />Wastewater treatment and conveyance services for the proposed project would be provided by the <br />City. As discussed above, the City owns and operates sanitary sewer lines throughout the City, and <br />conveys wastewater to the DSRSD regional WWTP. Through a contract agreement with the City, <br />DSRSD provides wastewater treatment services to the City. <br />The proposed project would be expected to generate 27,677 gpd, which is less wastewater than the <br />County Project’s estimated 32,667 gpd, given the nominal reduction in units.65 The DSRSD’s current <br />WWTP has a maximum treatment capacity of 17 million gallons per day (mgd), with an average dry <br />weather flow of 9.7 mgd. As such, consistent with the analysis in the Prior FEIR, it is anticipated that <br />the wastewater generation rate for the proposed project would equate to only approximately 0.19 <br />percent (or perhaps a bit less given the slight reduction in unit count) of the maximum treatment <br />capacity of the WWTP. <br />The DSRSD has observed that as water conservation measures have become more widely adopted, <br />flow rates have not increased; however, the reduced flow has resulted in an increase in nutrient <br />content loading that will be addressed through refinements to DSRSD’s treatment process. As part of <br />its ongoing master planning process, DSRSD will identify actions that will need to be implemented to <br />accommodate the increased loading generated by customers within its service area through the <br />future planning horizon year (2050). Any identified changes to the DSRSD treatment process will be <br /> <br />65 Assumes wastewater generation is equivalent to 90 percent of water demand.
The URL can be used to link to this page
Your browser does not support the video tag.