My WebLink
|
Help
|
About
|
Sign Out
PC-2026-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 12:52:06 PM
Creation date
8/5/2026 12:48:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 189 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />funded through increases in customer service rates and through connection fees imposed upon future <br />projects. <br />Nutrient loading refers to the mass of nutrients (primarily nitrogen and phosphorus) that is discharged <br />in treated effluent and is regulated through NPDES permits and regional water quality control <br />programs. Regional wastewater treatment facilities serving the City operate under permits issued by <br />the San Francisco Bay RWQCB that require ongoing monitoring, reporting, and compliance with <br />nutrient management requirements. These programs address cumulative nutrient contributions on a <br />regional scale and are not dependent on individualized CEQA analysis for each incremental <br />development project. The proposed project would not alter wastewater treatment processes, effluent <br />discharge points, or permit conditions, nor would it interfere with regional nutrient management <br />programs. <br />The proposed project would be required to pay applicable fees to reflect its fair share contribution to <br />the DSRSD in support of maintenance of its existing facilities and any planned equipment or process <br />refinements identified as part of its master planning. Since Section 15.16.010 of the City’s Municipal <br />Code requires sewer connections, all residential uses under the proposed project would be required <br />to connect to the City’s wastewater disposal system prior to issuance of building permits. Therefore, <br />the proposed project would not introduce new significant impacts or create substantially more severe <br />impacts than those previously identified in the Prior FEIR. No additional analysis is required. <br />d) Solid Waste Reduction Goals Consistency <br />Would the project: Generate solid waste in excess of State or local standards, or in <br />excess of the capacity of local infrastructure, or otherwise impair <br />the attainment of solid waste reduction goals? <br />Prior FEIR Conclusions <br />The Prior FEIR estimated that the County Project would generate approximately 3,700 tons of solid <br />waste during construction and 378 tons annually during operation. These amounts are within the <br />capacity of the PGS, which serves the area. The County Project would comply with Alameda County’s <br />Integrated Waste Management Plan and implement recycling and waste diversion measures <br />consistent with State mandates, including SB 1383. Therefore, the Prior FEIR concluded that impacts <br />would be less than significant. (Draft EIR, pp. 3.17-18–3.17-19, 6-22–6.24). <br />Proposed Project Analysis and Conclusion <br />The proposed project would result in substantially the same levels of solid waste generation <br />compared to the waste generation rates identified for the County Project in the Prior FEIR, although <br />slightly reduced due to the nominal unit count and substantial reduction in off-site utility <br />improvements. Using a standard operational waste generation rate of 3.0 pounds per capita per day <br />as analyzed in the Prior FEIR, the proposed project would generate approximately 1,764 pounds of <br />waste per day or approximately 322 tons of operational waste per year, reduced compared to that of <br />the County Project. The proposed project would be served by the Vasco Road Sanitary Landfill, which
The URL can be used to link to this page
Your browser does not support the video tag.