Todd Yamello <br />May 26, 2026 <br />Page 5 <br /> <br /> <br /> <br /> <br />Task 3 Assumptions <br />• City will provide existing instrumentation asset inventories, record drawings, PLC backups, O&M <br />manuals, and related documentation at the start of the task to support review and <br />recommendations. <br />• SCADA Graphical Standards Development is limited to documenting existing AVEVA InTouch <br />standards as currently used within the SCADA environment. Modifications and additions to graphical <br />templates are not included. <br />• HMI Database Conventions Standards Development is limited to documenting existing database <br />conventions as currently implemented. <br />• Control strategy development will focus on major facilities and representative remote sites; minor <br />facilities may be documented at a higher level unless otherwise directed. <br />• Field verification will be limited to targeted site visits (up to 16 hours) and will not include forensic <br />validation of wiring or PLC logic. <br />• City staff will be available to participate in workshops and will provide applicable SCADA and PLC <br />backup files prior to beginning the task. <br /> <br />Task 3 Deliverables <br />• West Yost will provide a Draft & Final SCADA Standards document that includes components as <br />outlined above. <br />Task 4. Backup Core SCADA Server Relocation Basis of Design and Cost Estimate <br />The objective of this task is to investigate and define the scope, level of effort, and planning-level cost <br />required to implement Project P1-2 – Backup Core SCADA Server Relocation. This task will not include <br />implementation of the relocation project, but will instead establish the technical framework, design <br />criteria, and budgetary estimate necessary for future execution. Work activities under this task include: <br />• Core SCADA Server Relocation Basis of Design – West Yost will develop a Basis of Design for <br />relocating the core SCADA server environment. Work will include reviewing existing server, <br />virtualization, network, storage/backup, power, and room layout conditions based on available <br />documentation and coordination with City IT and Utilities staff. West Yost will define relocation <br />objectives and design criteria, including redundancy, cybersecurity, physical security, <br />environmental controls, power resiliency, operational continuity, and potential backup server <br />locations. West Yost will also develop a high-level implementation approach addressing <br />sequencing, outages, testing, cutover, rollback, and coordination requirements to reduce <br />operational risk during future implementation. <br />• Planning-Level Cost Estimate Development – West Yost will prepare a planning-level cost <br />estimate consistent with an AACE Class 5 estimate. The estimate will include anticipated costs <br />for hardware procurement, software licensing (if applicable), network modifications, electrical <br />upgrades, environmental improvements, professional services, testing, commissioning, and <br />contingency. <br /> <br />Docusign Envelope ID: C46F6467-48FC-8755-8247-09E863327CA7Docusign Envelope ID: A1F306CD-3D85-8219-8045-1E730ABF3862