Laserfiche WebLink
5298389.1 <br />4.7 Project Permitting. Except as exempted by the Government Code Section 53091 <br />and other relevant sections of law, Zone 7 shall be responsible for obtaining and complying with <br />all applicable local, state, or federal permits necessary for the design, construction, and operation <br />of the Project. Such permits include, but are not limited to, stormwater pollution prevention plans <br />during construction, NPDES permits and other permits necessary to allow for the discharges of <br />wastewater, certification or other approval of any environmental review required under CEQA or <br />the National Environmental Policy Act (NEPA), compliance with environmental and other <br />regulations such as the Endangered Species Act, SGMA, water quality standards, etc. Zone 7 shall <br />be solely authorized and responsible for entering into contracts with consultants and contractors <br />as necessary to obtain any and all required permits and/or other approvals. Zone 7 has been <br />designated the lead agency responsible for conducting the environmental review and preparing <br />environmental document(s) that may be required under CEQA and/or NEPA. Nothing in this <br />Agreement should be construed as committing the Parties to any future development or activities <br />associated with the Project. Additionally, the Agreement is subject to the following conditions: (1) <br />the Agreement shall not limit the Parties’ choice of alternatives or mitigation measures under <br />CEQA/NEPA, including the no-project alternative; (2) the Agreement includes no vested <br />development entitlements, and no development entitlements shall be granted prior to compliance <br />with CEQA/NEPA; (3) the Agreement shall not bind the Parties or commit the Parties to any <br />definite course of action regarding the Project prior to CEQA/NEPA compliance; (4) the <br />Agreement shall not construed as a relinquishment of any rights necessary to comply with <br />CEQA/NEPA. <br />4.8 Design-Phase Off Ramp. Either Party to this Agreement may elect to discontinue <br />participation in the Project and terminate this Agreement prior to the commencement of <br />construction by providing at least ninety (90) days written notice to the non-terminating Party <br />(“Notice of Termination”). Upon receipt of a Notice of Termination, the Parties agree to <br />cooperate in good faith to wind down design activities and minimize additional, as-of-then <br />unaccrued costs. Each Party will remain responsible for its respective share of Project costs <br />incurred or contractually committed at the date of the Notice of Termination, including costs <br />accrued but not yet invoiced, and further including costs not yet accrued but which are unavoidable <br />due to the timing of the Notice of Termination. <br />5. Ownership of Project Work. <br />5.1 Work Product. All reports, data, plans, drawings, specifications, designs, <br />photographs, images, works of authorship. and other documents related to the Project and/or <br />performance of this Agreement shall become the property of both City and Zone 7 equally and <br />may be used by both Parties for purposes outside of this agreement. Notwithstanding the foregoing, <br />this provision shall not extend to confidential communications with or between Party attorneys, or <br />such other communications or documents which either Party deems confidential at the time it <br />transmits the document to the other Party. <br />5.2 Facilities. Upon completion of the Project, Zone 7 shall take full and sole <br />ownership and possession of all Project Facilities. <br />6. Operation and Maintenance of the Facilities. <br />Page 279 of 344