Laserfiche WebLink
5298389.1 <br />6.1 Operational Responsibility. Zone 7 shall be solely responsible for the operation, <br />maintenance, repair, and replacement (“O&M”) of Project Facilities, including delivery of City’s <br />Groundwater Supply, subject to the terms and conditions on such delivery set forth in this <br />Agreement. Zone 7 shall conduct all O&M work in accordance with any and all applicable <br />regulatory requirements, accepted professional standards, and best management practices. Zone 7 <br />shall bear all costs and liabilities associated with O&M work, except as expressly provided in this <br />Agreement. <br />6.2 Grant of Easement. To the extent City property is or becomes necessary for the <br />construction of the Project and/or Zone 7’s O&M work (“Project Land”), City shall grant Zone <br />7 express easements in perpetuity over such Project Land (“Project Easements”) and, in <br />recognition of the benefit of the Project to City, hereby waives all right to compensation for the <br />Project Easements except as otherwise required by law. City shall cooperate with Zone 7 to <br />negotiate the terms and scope of Project Easements, including access, exclusivity, and restoration <br />provisions as appropriate. In obtaining Project Easements, Zone 7 shall comply with the <br />requirements of the Public Park Preservation Act of 1971 (Public Resources Code, sections 5400– <br />5409), to the extent applicable. <br />6.3 Delivery of the Groundwater Supply. <br />6.3.1 Volume of Groundwater Supply. The City’s maximum entitlement to <br />Groundwater Supply pursuant to this Agreement is governed by the <br />definition of GPQ and related terms set forth in the Supply Contract. <br />6.3.2 In Lieu Supply Costs. During the design and construction phases of the <br />Project, and until the Project is operational, Zone 7 shall supply City’s GPQ <br />and associated maximum daily supply under the terms and costs of the <br />Supply Contract. The Parties acknowledge that the target Project <br />operational date set forth in this Agreement is an estimate. If the Project <br />fails to achieve operation on or before the December 28, 2029 solely due to <br />factors within Zone 7’s control, then for the period following December 28, <br />2029 and ending when the Project achieves operation, the cost of supplying <br />City’s GPQ shall be reduced to the In-Lieu Treated Water Rate as defined <br />in the Supply Contract. Thereafter, when the Project becomes operational, <br />City’s GPQ costs shall revert to the costs outlined in this Agreement. In the <br />event Project operationality is delayed due to factors within City’s control, <br />the target Project operational date will be extended by the same period as <br />the delay. <br />6.3.3 Delivery Schedule. City shall annually, on or before July 15 of each year, <br />submit a delivery schedule for use of City’s GPQ for the following calendar <br />year. City’s submittal shall be made in combination with its delivery <br />schedule for water pursuant to the Supply Contract on forms provided by <br />Zone 7. The delivery schedule for use of the City’s GPQ, in whole or in <br />part, will include a five (5) year outlook and anticipated (1) monthly supply, <br />(2) maximum daily supply, and (3) use of any GPQ roll-over. <br />Page 280 of 344