Laserfiche WebLink
<br /> <br /> <br />26 <br /> <br />Water Supply During Drought. The California Water Code asks agencies to evaluate <br />their water service reliability by examining the impact of drought on their water supplies and <br />comparing those reduced supplies to water demands. Specifically, agencies calculate their <br />water supplies during a single dry year and five consecutive dry years using historical records. <br />This water supply reliability assessment is documented within the City’s Urban Water <br />Management Plan (UWMP), which is closely tied to Zone 7’s water supply reliability <br />assessment. Under the City’s current 2025 UWMP, the water supply reliability assessment <br />projects the City will have adequate supply to meet a single dry year and indicates Zone 7 is <br />expected to have adequate supply reliability to meet the City’s current and projected demands <br />through 2045. Furthermore, the analysis projects a potential small shortfall for Pleasanton (10 <br />percent) in a five-year drought scenario beginning in 2045, specifically in the fifth consecutive <br />year of drought. This shortfall is considered manageable through conservation measures <br />consistent with the City’s Water Shortage Contingency Plan. Currently, the City does not project <br />a water supply shortfall in the upcoming year. <br /> <br />Regulatory Requirements <br /> <br />General. The applicable drinking water standards for the Water System are set forth <br />primarily in the California Code of Regulations, Title 22, Division 4, Chapter 15, Domestic Water <br />Quality and Monitoring Regulations, together with other applicable state law requirements. <br />These regulations implement California’s drinking water program in a manner consistent with, <br />and at least as stringent as, applicable requirements of the U.S. Environmental Protection <br />Agency under the federal Safe Drinking Water Act, originally enacted as Public Law 93-523. <br />The regulations establish, among other things, monitoring and reporting requirements, sampling <br />requirements, treatment requirements, and maximum contaminant levels for drinking water and <br />are subject to periodic revision and amendment. The Water System reports required data to the <br />State Water Resources Control Board, Division of Drinking Water, and provides its annual <br />Consumer Confidence Report to customers each year. <br /> <br />PFAS. In June 2019, City Well 8 was taken out of service after PFAS were detected <br />above DDW advisory levels. In November 2022, Wells 5 and 6 were taken out of service after <br />PFAS were detected above the revised DDW advisory levels. In 2024, USEPA laid out formal <br />regulations for PFAS with the establishment of MCLs and allows water systems five years to <br />comply. As a result, the City has lost the ability to utilize its groundwater production quota and is <br />currently required to purchase 100 percent of its water supply from Zone 7. This leads to higher <br />water supply costs, reduced diversification of local water supplies, and concerns about long- <br />term reliability, particularly during drought conditions. To address these concerns, the City <br />conducted a Water Supply Alternatives Study to assess multiple strategies including <br />rehabilitating the City’s existing wells with PFAS treatment, developing new groundwater wells <br />outside the PFAS plume, and continuing to rely entirely on purchased water from Zone 7. In <br />October 2023, the City Council approved the study's recommendation to pursue development of <br />new groundwater wells in the Bernal groundwater subbasin through the establishment of the <br />City Groundwater Supply Project. Additional engineering studies were completed with Zone 7 to <br />confirm the technical feasibility of building new groundwater wells in the Bernal groundwater <br />subbasin and found that doing so in partnership would be beneficial to both agencies. In April <br />2026, the City Council approved proceeding with the implementation of the City Groundwater <br />Supply project. Groundwater supply improvements would be implemented in partnership with <br />Zone 7 and would include the development of two new groundwater production wells at Tennis <br />and Community Park and Hansen Park, a new transmission pipeline connecting the wells to the <br />Zone 7 Hopyard Chloramination Facility, and upgrades to the Zone 7 Hopyard Chloramination <br />Page 236 of 318