Laserfiche WebLink
City of Pleasanton—Additional Housing Sites Rezonings Project <br />Addendum CEQA Guidelines Section 15164 Addendum <br /> <br /> <br />90 <br />requirements mandate site investigation, cleanup, and oversight by <br />regulatory agencies before redevelopment can occur. Contaminated sites <br />must undergo environmental site assessments and, if necessary, remediation <br />to reduce contamination to acceptable levels prior to occupancy or reuse. <br />Because remediation is required and enforced prior to development, <br />exposure risks are reduced and controlled at the project level. The Prior FEIR <br />concluded that impacts would be less than significant. <br />Proposed Project Analysis and Conclusion <br />According to the Cortese List,6 none of the proposed sites are located on or <br />near active identified contamination sources. Future development at the <br />proposed sites would be required to complete necessary studies and <br />assessments, including a Phase I ESA. This assessment would analyze the <br />project site’s historic and current uses and potential for contamination <br />sources. Therefore, impacts would be less than significant, and the proposed <br />project would not result in a new or more severe adverse impact that was <br />not previously identified and disclosed in the Prior FEIR. No further analysis is <br />required. <br />e) Proximity to Public Airport Safety Hazard <br />Would the project: For a project located within an airport land use plan or, where such <br />a plan has not been adopted, within two miles of a public airport <br />or public use airport, would the project result in a safety hazard or <br />excessive noise for people residing or working in the project area? <br />Summary of Prior FEIR <br />The Prior FEIR found that implementation of the General Plan would not <br />interfere with operations at the Livermore Municipal Airport or create <br />aviation-related safety hazards for people in the Planning Area. The analysis <br />reflected that planned land uses and development patterns under the <br />General Plan would remain compatible with airport operations and <br />applicable land use planning policies governing airport safety. Because no <br />conflict with airport operations or exposure to aviation hazards was identified, <br />no mitigation measures were required. The Prior FEIR concluded that impacts <br />would be less than significant. <br />Proposed Project Analysis and Conclusion <br />The proposed sites are not located within 2 miles of a public airport and are <br />not within an airport land use plan area. Therefore, no impacts would occur, <br /> <br />6 California Environmental Protection Agency (Cal/EPA). Cortese List Data Resources. Website: <br />https://calepa.ca.gov/sitecleanup/corteselist/. Accessed December 19, 2025.