Laserfiche WebLink
City of Pleasanton—Additional Housing Sites Rezonings Project <br />CEQA Guidelines Section 15164 Addendum Addendum <br /> <br /> <br /> 99 <br />Proposed Project Analysis and Conclusion <br />Future development on the proposed sites would be of the same general <br />type, scale, and intensity as development contemplated and evaluated in <br />the Prior FEIR and, therefore, would be subject to the same regulatory <br />framework and similarly required to comply with applicable General Plan <br />and Municipal Code regulations that would maximize groundwater <br />infiltration and ensure sufficient groundwater supplies. Furthermore, future <br />development would not be likely to increase the area of impervious surfaces, <br />as the proposed sites are currently hardscaped. The proposed project would <br />not expand the scope of development evaluated, introduce new <br />development types, or increase development intensity beyond what was <br />previously analyzed. <br />The addition of new housing and commercial space would result in an <br />increase in connections to the municipal water supply, which could <br />potentially increase demand on groundwater supplies as provided by Zone <br />7. Zone 7 is responsible for supplying water as a wholesaler to the City by <br />storing water from the South Bay Aqueduct and from local sources, including <br />the Del Valle Reservoir, which is used to replenish groundwater supplies <br />through release into the Arroyo del Valle and the Arroyo Mocho. Because <br />the proposed project is within the scope of what was analyzed in the <br />certified Housing Element Update FEIR, potential impacts to groundwater <br />demand have already been considered, and future development would be <br />required to comply with applicable federal, State, and local regulations with <br />regard to water demand and supply. Therefore, the proposed project would <br />not result in significant impacts related to groundwater supplies or recharge. <br />Impacts would be less than significant, and the proposed project would not <br />result in a new or more severe adverse impact that was not previously <br />identified and disclosed in the Prior FEIR. No further analysis is required. <br />d) Risk of Pollutant Release Due to Inundation <br />Would the project: In flood hazard, tsunami, or seiche zones, risk release of pollutants <br />due to project inundation? <br />Summary of Prior FEIR <br />Impacts related to flooding risks are discussed above. Although the Prior FEIR <br />did not evaluate potential impacts related to tsunami or seiche zones, the <br />Prior FEIR concluded that with implementation of General Plan policies and <br />actions, the impacts due to dam failure would be less than significant.