My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 09092026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
09-09
>
Planning Commission Agenda Packet 09092026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2026 12:59:11 PM
Creation date
9/10/2026 12:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/9/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Additional Housing Sites Rezonings Project <br />CEQA Guidelines Section 15164 Addendum Addendum <br /> <br /> <br /> 129 <br />Environmental Issue <br />Area <br />Prior FEIR <br />Determination <br />New or More <br />Severe <br />Impacts? <br />New <br />Circumstances <br />Involving New or <br />More Severe <br />Impacts? <br />New <br />Information <br />Requiring <br />New Analysis <br />or <br />Verification? <br />Applicable <br />Mitigation <br />Measures <br />XVIII. Utilities and Service Systems <br />Would the project: <br />a) Require or result in <br />the relocation or <br />construction of new <br />or expanded water, <br />wastewater <br />treatment or <br />stormwater <br />drainage, electric <br />power, natural gas, <br />or <br />telecommunications <br />facilities, the <br />construction or <br />relocation of which <br />could cause <br />significant <br />environmental <br />effects? <br />Less than <br />significant <br />impact <br />No No No None <br />b) Have sufficient <br />water supplies <br />available to serve <br />the project and <br />reasonably <br />foreseeable future <br />development during <br />normal, dry and <br />multiple dry years? <br />Less than <br />significant <br />impact <br />No No No None <br />c) Result in a <br />determination by <br />the wastewater <br />treatment provider <br />which serves or may <br />serve the project <br />that it has adequate <br />capacity to serve <br />the project’s <br />projected demand <br />in addition to the <br />provider’s existing <br />commitments? <br />Less than <br />significant <br />impact <br />No No No None <br />d) Generate solid <br />waste in excess of <br />State or local <br />Less than <br />significant <br />impact <br />No No No None
The URL can be used to link to this page
Your browser does not support the video tag.