My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 09092026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
09-09
>
Planning Commission Agenda Packet 09092026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2026 12:59:11 PM
Creation date
9/10/2026 12:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/9/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Additional Housing Sites Rezonings Project <br />Addendum CEQA Guidelines Section 15164 Addendum <br /> <br /> <br />130 <br />Environmental Issue <br />Area <br />Prior FEIR <br />Determination <br />New or More <br />Severe <br />Impacts? <br />New <br />Circumstances <br />Involving New or <br />More Severe <br />Impacts? <br />New <br />Information <br />Requiring <br />New Analysis <br />or <br />Verification? <br />Applicable <br />Mitigation <br />Measures <br />standards, or in <br />excess of the <br />capacity of local <br />infrastructure, or <br />otherwise impair the <br />attainment of solid <br />waste reduction <br />goals? <br />e) Comply with <br />federal, State, and <br />local management <br />and reduction <br />statutes and <br />regulations related <br />to solid waste? <br />Less than <br />significant <br />impact <br />No No No None <br /> <br />a) Water, Wastewater, Stormwater, Electric Power, Natural Gas, and <br />Telecommunications <br />Would the project: Require or result in the relocation or construction of new or <br />expanded water, wastewater treatment or stormwater drainage, <br />electric power, natural gas, or telecommunications facilities, the <br />construction or relocation of which could cause significant <br />environmental effects? <br />Summary of Prior FEIR <br />Water <br />The Prior FEIR found that water supplies for the City are generally provided by <br />Zone 7, with supplementation by City groundwater pumping. Approximately <br />75 percent of the water supplied by Zone 7 is surface water from the SWP. <br />According to the Prior FEIR, Zone 7 has adopted a Water Supply Reliability <br />Policy to maintain the ability to meet 100 percent of Zone 7’s estimate for <br />treated water demands for 100 percent of the time. According to the Prior <br />FEIR, in accordance with General Plan policies and applicable regulations, <br />impacts related to the construction or expansion of water facilities or <br />infrastructure would be less than significant.
The URL can be used to link to this page
Your browser does not support the video tag.