Laserfiche WebLink
City of Pleasanton—Additional Housing Sites Rezonings Project <br />CEQA Guidelines Section 15164 Addendum Addendum <br /> <br /> <br /> 131 <br />Wastewater <br />The City provides sewage collection and local pumping services within the <br />City limits. The City’s collection system, which consists of over 250 miles of <br />local and trunk sewer pipes, as well as 10 sewer lift stations, moves the City’s <br />wastewater to the Dublin-San Ramon Services District (DSRSD) Wastewater <br />Treatment Plant (WWTP). The City is entitled to half, or 8.5 million gallons per <br />day (MGD), of the DSRSD WWTP’s 17 MGD capacity. The Prior FEIR concluded <br />that buildout of the General Plan would result in a less than significant impact <br />related to wastewater treatment capacity. <br />Stormwater Drainage Capacity <br />The Prior FEIR found that buildout of the General Plan would require <br />stormwater improvements to accommodate the expected stormwater <br />drainage needs. Individual projects in the Planning Area would be subject to <br />project-level environmental analysis for compliance with the General Plan, <br />which would guide new development to maintain pervious surface areas <br />and minimize stormwater runoff, provide adequate storm drain infrastructure, <br />and provide sufficient stormwater retention capacity. The Prior FEIR <br />concluded that impacts would be less than significant. <br />Electric Power, Natural Gas, and Telecommunications <br />The Prior FEIR found that the General Plan includes various policies to reduce <br />electricity and natural gas demands. However, new development would <br />result in the long-term consumption of electricity and natural gas. Individual <br />development projects would be assessed in project-level analyses, and all <br />structures and site layouts would be required to comply with applicable Title <br />24 energy conservation standards, reducing potential impacts. <br />Proposed Project Analysis and Conclusion <br />Water <br />Like the development considered in the Prior FEIR, future development on the <br />proposed sites would be required to fund their fair share of upgrading utility <br />infrastructure as needed to serve a project per Municipal Code Section 3.22. <br />This may include installing water mains, new water meters, and/or upgrades <br />to existing facilities. The City would review individual development projects at <br />the time of application to establish requirements for funding any <br />infrastructure improvements necessary to mitigate project-specific impacts <br />that have not been previously identified as part of a capital improvement <br />program covered by development impact fees. Consistent with applicable