Laserfiche WebLink
City of Pleasanton—Additional Housing Sites Rezonings Project <br />Addendum CEQA Guidelines Section 15164 Addendum <br /> <br /> <br />132 <br />State laws, the City’s development fees would ensure that the developers <br />pay the cost attributable to the increased demand for the affected public <br />facilities reasonably related to the development project to maintain the <br />existing LOS and achieve an adopted LOS that is consistent with the City’s <br />General Plan and Municipal Code (California Government Code Section <br />66001(g)). Therefore, impacts would be less than significant, and the <br />proposed project would not result in a new or more severe adverse impact <br />that was not previously identified and disclosed in the Prior FEIR. No further <br />analysis is required. <br /> <br />Wastewater <br />As explained in Section 2, Project Description, maximum buildout of the <br />proposed sites is within the scope of and would result in fewer housing units <br />than what was analyzed in the certified Housing Element Update FEIR. <br />General Plan Chapter 8, Water Element, Goal 5 is to provide adequate <br />sewage treatment and minimize wastewater export. Policy 5 is to secure <br />sewage capacity through all available means for residential, commercial, <br />and industrial development. This policy includes a program that requires new <br />development to pay its fair share of the City’s planned sewer system <br />improvements, including treatment, distribution, reuse, and export facilities, <br />which would be evaluated through the City’s new hydraulic sewer model. <br />Future development consistent with the proposed project would be located <br />within the urban framework of the City and near existing wastewater <br />infrastructure. The City currently complies with applicable statutory, including <br />Title 15 of the Municipal Code, and those requirements ensure that the City <br />would continue to comply with State and federal regulatory requirements <br />related to wastewater. All new development would be required to pay a fair <br />share of the City’s planned sewer system improvements. Therefore, <br />development consistent with the proposed project would not result in <br />insufficient wastewater collection and treatment, and no new or expanded <br />wastewater treatment facilities would be needed. Therefore, the proposed <br />project would not result in new or more severe wastewater impacts than <br />those disclosed in the Prior FEIR. Impacts would remain less than significant, <br />and no further analysis is required. <br />Stormwater Drainage <br />As explained in Section 2, Project Description, maximum buildout of the <br />proposed sites is within the scope of and would result in fewer housing units <br />than what was analyzed in the certified Housing Element Update FEIR.