Laserfiche WebLink
City of Pleasanton—Additional Housing Sites Rezonings Project <br />CEQA Guidelines Section 15164 Addendum Addendum <br /> <br /> <br /> 137 <br />Future development consistent with the proposed project would be located <br />within the urban framework of the City and near existing wastewater <br />infrastructure. The City currently complies with the applicable statutory <br />requirements, including Title 15 of the Municipal Code and those <br />requirements ensure that the City would continue to comply with State and <br />federal regulatory requirements related to wastewater. All new development <br />would be required to pay a share of the City’s and/or Dublin San Ramon <br />Services District planned sewer system improvements. Therefore, <br />development consistent with the proposed project would not result in <br />insufficient wastewater collection and treatment. Therefore, the proposed <br />project would not result in new or more severe wastewater impacts than <br />those disclosed in the Prior FEIR. Impacts would remain less than significant, <br />and no further analysis is required. <br />d,e) Solid Waste Reduction Goals and Regulations Consistency <br />Would the project: d) Generate solid waste in excess of State or local standards, or in <br />excess of the capacity of local infrastructure, or otherwise <br />impair the attainment of solid waste reduction goals and <br /> e) Comply with federal, State, and local management and <br />reduction statutes and regulations related to solid waste. <br />Summary of Prior FEIR <br />The Prior FEIR determined that the Pleasanton Garbage Service (PGS) <br />provides solid waste and recycling services to the businesses and residents of <br />the City. PGS has contracted with Browning Ferris Industries for disposal at the <br />Vasco Road Sanitary Landfill in Livermore, California. Pursuant to the Landfill’s <br />current Solid Waste Facility Permit, the Landfill has a maximum permitted <br />tonnage limit of 2,518 tons per day and a design capacity of 40,207,100 <br />cubic yards, with remaining capacity of 11,560,000 cubic yards. New solid <br />waste generated under buildout of the General Plan would represent less <br />than 0.3 percent of this total. In addition, not all of the solid waste generated <br />under buildout of the General Plan would be landfilled; diversion programs <br />would reduce the solid waste interred. Therefore, cumulative development in <br />the City and implementation of the General Plan would result in a less than <br />significant impact with respect to solid waste disposal. <br />Proposed Project Analysis and Conclusion <br />As explained in Section 2, Project Description, maximum buildout of the <br />proposed sites is within the scope of and would result in fewer housing units <br />than what was analyzed in the certified Housing Element Update FEIR.